|
|
User:Ndawes
From SwissExperiment
Ndawes
Nicholas Dawes
Latest blog posts
| Local vs not working
|
| All local vs are not working. For this reason, I have removed all plotting vs.
posted 31 December 2011 in Changes to the montblanc data server; read more
|
| Irkis Chaiseren changed to csv wrapper
|
| As the local wrapper was closing its connection before data was read in, I changed this to a csv wrapper to make it work. There are now two vs (chaise
posted 31 December 2011 in Changes to the montblanc data server; read more
|
| Alarms added to wan_tib1/2/3 sensors
|
| Alarms added to these sensors for when they do not update and when the battery level is too low. This was added earlier in December, but I have now up
posted 31 December 2011 in Changes to the montblanc data server; read more
|
… further results
All active blogs; Wiki admin blog ( read more), EPFL/LSIR Aberer ( read more), ETHZ/IKA Hurni ( read more), EPFL/LTE Berne ( read more), GSN Workshop ( read more), ETHZ/HWRM Burlando ( read more), EPFL/LCAV Vetterli ( read more), EPFL/ISIM Charbon ( read more), SwissEx Admin ( read more), SwissEx Science ( read more), EPFL/DISAL Martinoli ( read more), EPFL/EFLUM Parlange ( read more), ETHZ/SED Fäh ( read more), EAWAG Schirmer ( read more), WSL/SLF Lehning ( read more), ETHZ/TIK Thiele ( read more), EAWAG Schirmer ( read more), Changes to the montblanc data server ( read more), SLF Snow and Permafrost Research Unit ( read more), SLF Wind Tunnel ( read more)
Latest Queries
Queries can be created from the metadata pages, or using this form.
Project management overview for Ndawes
Projects
Ndawes is the manager of the following projects;
Current tasks
Tasks below are all open. To remove tasks from this list, set their status to closed.
MONTHYEARWP4 Milestone 1: Integration of CCES projects into the SwissEx infrastructure2008-09-01T00:00:002012-08-31T23:59:590Type: milestone click here for details Project: SwissEx Start date: 1 September 2008 End date: 31 August 2012 Info: Integration of CCES projects into the SwissEx infrastructure WP2 Milestone1: Comparison of SensorMap vs. IKA GIS interface2008-09-01T00:00:002011-08-31T23:59:590Type: milestone click here for details Project: SwissEx Start date: 1 September 2008 End date: 31 August 2011 Info: Comparison of SensorMap vs. IKA GIS interface WP4 Milestone 2: Precipitation measurement campaign in alpine terrain2010-01-01T00:00:002011-02-28T23:59:590Type: milestone click here for details Project: SwissEx Start date: 1 January 2010 End date: 28 February 2011 Info: Precipitation measurement campaign in alpine terrain WP3 Milestone 2: Setup of Calibration and Measurement Team2008-09-01T00:00:002010-08-31T23:59:590Type: milestone click here for details Project: SwissEx Start date: 1 September 2008 End date: 31 August 2010 Info: WP3 Milestone 1: Setup of Calibration and Measurement Team WP3 Milestone 4: Permasense 2nd generation network2008-09-01T00:00:002012-08-31T23:59:590Type: milestone click here for details Project: SwissEx Start date: 1 September 2008 End date: 31 August 2012 Info: WP3 Milestone 1: Permasense 2nd generation network WP1 Milestone1: Integration of data2008-09-01T00:00:002012-08-31T23:59:590Type: milestone click here for details Project: SwissEx Start date: 1 September 2008 End date: 31 August 2012 Info: Integration of data WP3 Milestone 6: Sensorscope 3rd generation network2008-09-01T00:00:002012-08-31T23:59:590Type: milestone click here for details Project: SwissEx Start date: 1 September 2008 End date: 31 August 2012 Info: Sensorscope 3rd generation network WP1 Milestone2: Baseline SwissEx data infrastructure completion2008-09-01T00:00:002012-08-31T23:59:590Type: milestone click here for details Project: SwissEx Start date: 1 September 2008 End date: 31 August 2012 Info: Baseline SwissEx data infrastructure completion WP3 Milestone 8: Completion of RADAR, LIDAR and Disdrometer development2008-09-01T00:00:002012-08-31T23:59:590Type: milestone click here for details Project: SwissEx Start date: 1 September 2008 End date: 31 August 2012 Info: Completion of RADAR, LIDAR and Disdrometer development WP1 Milestone3: Advanced infrastructure development completion2008-09-01T00:00:002012-08-31T23:59:590Type: milestone click here for details Project: SwissEx Start date: 1 September 2008 End date: 31 August 2012 Info: Advanced infrastructure development completion Infrastructure workshop2011-02-01T00:00:002011-02-28T23:59:590Type: task click here for details Project: SwissEx Start date: 1 February 2011 End date: 28 February 2011 Info: Organise an infrastructure workshop Paper on characterisation of annotations on a data model2010-09-01T00:00:002011-08-31T23:59:590Type: task click here for details Project: SwissEx Start date: 1 September 2010 End date: 31 August 2011 Info: Produce a paper on the characterisation of annotations on a data model Downscaling: Import NWP data to GSN2010-04-01T00:00:002010-05-27T23:59:590Type: task click here for details Project: SwissEx Science Start date: 1 April 2010 End date: 27 May 2010 Info: Implement a method to transfer data from NWP model repositories to GSN. Feature requests Q4 20102010-10-01T00:00:002010-12-31T23:59:590Type: task click here for details Project: Wiki Development Start date: 1 October 2010 End date: 31 December 2010 Info: Collection of requests for modifications / upgrades to the wiki in Q4 2010 Integration of all data into the infrastructure2008-09-01T00:00:002012-08-31T23:59:590Type: task click here for details Project: SwissEx Start date: 1 September 2008 End date: 31 August 2012 Info: Integrate as much data as possible into the SwissEx infrastructure and get people using it. It is only worthwhile if it is used. 3D wind sensors2010-07-14T00:00:002010-10-14T23:59:590Type: task click here for details Project: Wannengrat Start date: 14 July 2010 End date: 14 October 2010 Info: The 3D wind sensors regularly break down. During the lat winter I went up to WAN4 twice, and each time one of the rotors was on the snow surface. At the end of the season the same happened at WAN6. We should consider replacing the 3D wind sensors with simple young wind sensors. There is still a brand new young sensor in the cupboard with spare parts for Wannengrat on the second floor in the C wing at the SLF SensorScope station for Davos schools2008-09-01T00:00:002009-05-31T23:59:590Type: task click here for details Project: SwissEx Start date: 1 September 2008 End date: 31 May 2009 Info: Procure a SensorScope station for the schools in Davos Calibration of SensorScope meteorological instruments2008-09-01T00:00:002010-08-31T23:59:590Type: task click here for details Project: SwissEx Start date: 1 September 2008 End date: 31 August 2010 Info: Produce a web publication on the wiki detailing how to calibrate the SensorScope stations, and where possible, the calibrations. Meteoswiss and BAFU data (depending on access possibilities)2008-09-01T00:00:002012-08-31T23:59:590Type: task click here for details Project: SwissEx Start date: 1 September 2008 End date: 31 August 2012 Info: Make data from Meteoswiss and BAFU accessible over the SwissEx infrastructure where possible.
Active items
The table below shows all open items that have already started. Overdue tasks are highlighted.
| Project
| Task
| Type
| Dates
| Complete
| Who
|
| SwissEx
| SensorScope station for Davos schools (PMtaskba0896d)
| task
| 1 September 2008 to 31 May 2009
| 0 %
| Lehning, Ndawes
|
| SwissEx Science
| Downscaling: Import NWP data to GSN (PMtask01775a1)
| task
| 1 April 2010 to 27 May 2010
| 20 %
| Andy.clifton, Ndawes, Megan.daniels
|
| SwissEx
| Calibration of SensorScope meteorological instruments (PMtask3c219b1)
| task
| 1 September 2008 to 31 August 2010
| 0 %
| Ndawes, Lehning, Bavay
|
| SwissEx
| WP3 Milestone 2: Setup of Calibration and Measurement Team (PMtask7e67a31)
| milestone
| 1 September 2008 to 31 August 2010
| 50 %
| Ndawes, Lehning
|
| Wannengrat
| 3D wind sensors (PMtaska151ce4)
| task
| 14 July 2010 to 14 October 2010
| 30 %
| Alec, Ndawes, Mhiller
|
| Wiki Development
| Feature requests Q4 2010 (PMtask8c507bc)
| task
| 1 October 2010 to 31 December 2010
| 50 %
| Andy.clifton, Ndawes, Ipaparrizos
|
| SwissEx
| Infrastructure workshop (PMtaskc735117)
| task
| 1 February 2011 to 28 February 2011
| 0 %
| Ndawes, Lehning
|
| SwissEx
| WP4 Milestone 2: Precipitation measurement campaign in alpine terrain (PMtask7e67a50)
| milestone
| 1 January 2010 to 28 February 2011
| 50 %
| Ndawes, Lehning
|
| SwissEx
| Paper on characterisation of annotations on a data model (PMtaskfb3df06)
| task
| 1 September 2010 to 31 August 2011
| 0 %
| Ndawes, Lehning
|
| SwissEx
| WP2 Milestone1: Comparison of SensorMap vs. IKA GIS interface (PMtask61b7f53)
| milestone
| 1 September 2008 to 31 August 2011
| 70 %
| Ndawes, Lehning
|
| SwissEx
| WP3 Milestone 6: Sensorscope 3rd generation network (PMtask7e67a35)
| milestone
| 1 September 2008 to 31 August 2012
| 20 %
| Ndawes, Lehning
|
| SwissEx
| Meteoswiss and BAFU data (depending on access possibilities) (PMtask351b75f)
| task
| 1 September 2008 to 31 August 2012
| 20 %
| Ndawes, Lehning
|
| SwissEx
| WP1 Milestone1: Integration of data (PMtask61b7f50)
| milestone
| 1 September 2008 to 31 August 2012
| 30 %
| Ndawes, Lehning
|
| SwissEx
| WP1 Milestone3: Advanced infrastructure development completion (PMtask61b7f52)
| milestone
| 1 September 2008 to 31 August 2012
| 30 %
| Ndawes, Lehning
|
| SwissEx
| Integration of all data into the infrastructure (PMtaskf8d548f)
| task
| 1 September 2008 to 31 August 2012
| 30 %
| Ndawes, Lehning
|
| SwissEx
| WP3 Milestone 4: Permasense 2nd generation network (PMtask7e67a33)
| milestone
| 1 September 2008 to 31 August 2012
| 50 %
| Ndawes, Lehning
|
| SwissEx
| WP3 Milestone 8: Completion of RADAR, LIDAR and Disdrometer development (PMtask7e67a37)
| milestone
| 1 September 2008 to 31 August 2012
| 50 %
| Ndawes, Lehning
|
| SwissEx
| WP4 Milestone 1: Integration of CCES projects into the SwissEx infrastructure (PMtask7e67a38)
| milestone
| 1 September 2008 to 31 August 2012
| 50 %
| Ndawes, Lehning
|
| SwissEx
| WP1 Milestone2: Baseline SwissEx data infrastructure completion (PMtask61b7f51)
| milestone
| 1 September 2008 to 31 August 2012
| 80 %
| Ndawes, Lehning
|
Tentative items
Tentative items are defined as those that have a status open and start in the future.
| Project
| Task
| Type
| Dates
| Complete
| Who
|
| SwissEx
| Provision of Year 3 progress text to Nick (PMtask1120f68)
| task
| 1 July 2011 to 31 August 2011
| 0 %
| Ndawes, Aberer, Aberne, Alcherio, Alexander.bahr, Beutel, Charbon, Donat.faeh, Dfinger, Gbarrene, Hoyoung Jeung, Ionut.iosifescu, Lehning, Marc.schneebeli, Mario.schirmer, Pburlando, Vluyet
|
| SwissEx
| Provision of Year 3 finances to Nick (PMtask7d59064)
| task
| 1 September 2011 to 31 October 2011
| 0 %
| Ndawes, Aberer, Aberne, Alcherio, Alexander.bahr, Beutel, Charbon, Donat.faeh, Dfinger, Gbarrene, Hoyoung Jeung, Ionut.iosifescu, Lehning, Marc.schneebeli, Mario.schirmer, Pburlando, Vluyet
|
| SwissEx
| Submission of year 3 report (PMtask9b5d6ee)
| task
| 1 November 2011 to 5 November 2011
| 0 %
| Ndawes
|
| Wannengrat
| Fix UVW at Wan6 (PMtaskd857b22)
| task
| 17 January 2012 to 17 February 2012
| 0 %
| Mhiller, Ndawes
|
| Wannengrat
| Fix wind sensor at Wan4b (PMtaskbe81732)
| task
| 17 January 2012 to 17 February 2012
| 0 %
| Mhiller, Ndawes
|
| SwissEx
| SwissEx Meeting (PMtask633c29i)
| task
| 1 January 2012 to 28 February 2012
| 0 %
| Lehning, Ndawes
|
| SwissEx
| WP4 Milestone 3: Vispa catchment measurement campaign (PMtask7e67a51)
| milestone
| 1 September 2011 to 31 August 2012
| 50 %
| Ndawes, Lehning
|
Completed items
Completed items are defined as those that have a status closed.
| Project
| Task
| Type
| Dates
| Complete
| Who
|
| SwissEx
| Infrastructure for retrieving TRAMM and BigLink streaming data (PMtaskd3a7d7c)
| task
| 1 September 2008 to 31 December 2008
| 100 %
| Ndawes, Lehning, Hoyoung Jeung, Aberer
|
| SwissEx
| Infrastructure workshop (PMtaske486fc6)
| task
| 1 February 2009 to 28 February 2009
| 100 %
| Ndawes, Lehning, Hoyoung Jeung, Aberer, Mario.schirmer, Philipp.schneider
|
| SwissEx
| Control and publishing of metadata (PMtaskd34b22a)
| task
| 1 September 2008 to 28 February 2009
| 100 %
| Ndawes, Lehning, Hoyoung Jeung, Aberer
|
| SwissEx
| SwissEx Meeting (PMtask633c29f)
| task
| 1 February 2009 to 28 February 2009
| 100 %
| Lehning, Ndawes
|
| SwissEx
| SensorScope Stations for all CCES projects (PMtaskee74831)
| task
| 1 September 2008 to 30 April 2009
| 100 %
| Gbarrene, Ndawes, Lehning
|
| SwissEx
| SwissEx Meeting (PMtask633c29g)
| task
| 1 July 2009 to 31 August 2009
| 100 %
| Lehning, Ndawes
|
| SwissEx
| WP3 Milestone 3: Long distance communications links (PMtask7e67a32)
| milestone
| 1 February 2009 to 1 February 2010
| 100 %
| Ndawes, Lehning
|
| SwissEx
| SwissEx Meeting (PMtask633c29k)
| task
| 1 January 2010 to 28 February 2010
| 0 %
| Lehning, Ndawes
|
| SwissEx
| Infrastructure workshop (PMtaskc735116)
| task
| 1 February 2010 to 28 February 2010
| 50 %
| Ndawes, Lehning
|
| SwissEx
| WP3 Milestone 5: Hydromon self organising wireless network (PMtask7e67a34)
| milestone
| 1 September 2008 to 28 February 2010
| 100 %
| Ndawes, Lehning
|
| SwissEx
| Operational data exploitation software (PMtaskf52d25c)
| task
| 1 September 2008 to 28 February 2010
| 100 %
| Hoyoung Jeung, Aberer, Ndawes, Lehning
|
| SwissEx Science
| Downscaling: Extraction tools (PMtaskf1ad9a7)
| task
| 1 January 2010 to 15 March 2010
| 100 %
| Andy.clifton, Ndawes
|
| SwissEx
| SensorScope Testbed in Wannengrat (PMtaskfdba802)
| task
| 1 April 2009 to 30 April 2010
| 100 %
| Gbarrene, Ndawes, Lehning
|
| SwissEx Science
| Downscaling: Create AWS to AWS methods (PMtask9428056)
| task
| 23 April 2010 to 15 July 2010
| 75 %
| Andy.clifton, Ndawes
|
| SwissEx
| CCES Status report 2010 compilation (PMtask1665c3f)
| task
| 1 July 2010 to 23 July 2010
| 100 %
| Ndawes
|
| SwissEx
| WP3 Milestone 1: Sensorscope 2nd generation network (PMtask7e67a39)
| milestone
| 1 September 2008 to 31 August 2010
| 100 %
| Ndawes, Lehning
|
| SwissEx
| WP3 Milestone 7: Sensorscope extreme environment testing (PMtask7e67a36)
| milestone
| 1 September 2008 to 31 August 2010
| 100 %
| Ndawes, Lehning
|
| SwissEx
| Provision of Year 2 progress text to Nick (PMtask676eb8b)
| task
| 1 July 2010 to 31 August 2010
| 100 %
| Ndawes, Aberer, Aberne, Alcherio, Alexander.bahr, Beutel, Charbon, Donat.faeh, Dfinger, Gbarrene, Hoyoung Jeung, Ionut.iosifescu, Lehning, Marc.schneebeli, Mario.schirmer, Pburlando, Vluyet
|
| SwissEx
| Data infrastructure for Mountland, Majolica and APUNCH streaming data (PMtask9a9d5dd)
| task
| 1 September 2009 to 31 August 2010
| 100 %
| Ndawes, Lehning
|
| SwissEx
| Paper on dense spatially and temporally distributed measurements from Wannengrat (PMtask075930f)
| task
| 1 September 2008 to 31 August 2010
| 100 %
| Ndawes, Lehning, Bavay
|
| SwissEx
| Generic model interface (PMtask6cf5de2)
| task
| 1 September 2008 to 1 September 2010
| 100 %
| Ndawes, Lehning, Hoyoung Jeung, Aberer, Bavay
|
| Wannengrat
| Summer maintenance (PMtask5cba7c3)
| task
| 14 July 2010 to 14 September 2010
| 100 %
| Alec, Ndawes
|
| SLF Wind Tunnel
| Team Excursion (PMtask0222d8c)
| meeting
| 23 September 2010
| 0 %
| Lehning, Benni.walter, Christoph.gromke, Ndawes
|
| Wannengrat
| Wan2 air temperature sensor to be repaired (PMtask37be66f)
| task
| 12 July 2010 to 30 September 2010
| 100 %
| Ndawes
|
| SwissEx Science
| Downscaling: Implement methods in SwissEx Infrastructure (PMtaskb4ab3e1)
| task
| 20 August 2010 to 14 October 2010
| 75 %
| Andy.clifton, Ndawes
|
| Wannengrat
| WAN1 radiation sensor broken (PMtask7436361)
| task
| 14 July 2010 to 14 October 2010
| 100 %
| Alec, Ndawes
|
| Wannengrat
| Fall cleanup (PMtaskd9dd324)
| task
| 1 October 2010 to 30 October 2010
| 100 %
| Alec, Ndawes
|
| SwissEx
| Provision of Year 2 finances to Nick (PMtask511affa)
| task
| 1 September 2010 to 31 October 2010
| 100 %
| Ndawes, Aberer, Aberne, Alcherio, Alexander.bahr, Beutel, Charbon, Donat.faeh, Dfinger, Gbarrene, Hoyoung Jeung, Ionut.iosifescu, Lehning, Marc.schneebeli, Mario.schirmer, Pburlando, Vluyet
|
| SwissEx
| Submission of year 2 report (PMtaskd91345f)
| task
| 1 November 2010 to 5 November 2010
| 100 %
| Ndawes
|
| SwissEx Science
| Latsis Poster submission (PMtask13640d0)
| milestone
| 8 November 2010
| 5 %
| Andy.clifton, Megan.daniels, Ndawes, Lehning
|
| SwissEx
| Latsis Symposium (PMtaska5f559f)
| task
| 15 November 2010 to 17 November 2010
| 100 %
| Ndawes, Aberer, Aberne, Alcherio, Alexander.bahr, Beutel, Charbon, Donat.faeh, Dfinger, Gbarrene, Hoyoung Jeung, Ionut.iosifescu, Lehning, Marc.schneebeli, Mario.schirmer, Pburlando, Vluyet, Andy.clifton
|
| SwissEx
| CCES 2010 Assessment (PMtaskbc4df96)
| task
| 17 November 2010 to 19 November 2010
| 100 %
| Ndawes, Lehning
|
| Wannengrat
| WAN3: Add sonic (PMtaskdba5947)
| task
| 1 November 2010 to 30 November 2010
| 100 %
| Ndawes, Lussi
|
| Wannengrat
| Replace westerly UVW component (PMtaskef3a7c2)
| task
| 5 November 2010 to 5 December 2010
| 100 %
| Mhiller, Ndawes
|
| Wannengrat
| Winter fencing (PMtask88f46a8)
| task
| 14 November 2010 to 14 December 2010
| 100 %
| Ndawes
|
| Project Management Tool
| Feature requests Q4 2010 (PMtaskbca9a0e)
| task
| 4 October 2010 to 31 December 2010
| 100 %
| Andy.clifton, Ndawes, Ipaparrizos
|
| SwissEx
| SwissEx Meeting (PMtask633c29j)
| task
| 1 January 2011 to 28 February 2011
| 0 %
| Lehning, Ndawes
|
| Wannengrat
| Spring Cleanup (PMtask10a793d)
| task
| 31 May 2011 to 30 June 2011
| 100 %
| Ndawes
|
| Wannengrat
| Replace battery and cable on Wan 7 (PMtask3c6a7bd)
| task
| 31 May 2011 to 31 July 2011
| 100 %
| Ndawes, Mhiller
|
| SwissEx
| SwissEx Meeting (PMtask633c29h)
| task
| 1 July 2011 to 31 August 2011
| 100 %
| Lehning, Ndawes
|
| Wannengrat
| Update all logger firmware (PMtaskb971058)
| task
| 30 June 2011 to 31 October 2011
| 100 %
| Mhiller, Ndawes
|
Calendar export
WARNING: THIS FUNCTION MAY NOT WORK CORRECTLY
|