21.11.2007
- Swiss Experiment press conference at EPFL in Lausanne.
15.11.2007
- Flowmeter tests will provide estimates for hydrological conductivity at our channelized field site at River Thur near Widen/TG.
06.11.2007
- The Geoprobe has arrived.
- After a 3 day training we will start with piezometer installation and soil core and water sampling at our restored field site at River Thur near Neunforn/TG with "the big machine".
31.10.2007
- Photos 15 m above ground, checking camera perspective and location for the planed vegetation monitoring towers.
04.10.2007
- Survey flight with airplane for high resolution "digital terrain model" and new orthophotos documenting the actual status of the channel topography at River Thur near Neunforn/TG.
24.09.2007
- River Thur profile measurements at the field site near Neunforn/TG finished.
12.08.2007
- Morphological changes at the restored site near Neunforn/TG. New gravel bar near the road bridge, many bars been reduced and lost a lot of sediment.
- Main channel moves to the left (in orientation to flow direction). The big island is now not an island in low flow conditions any more.
09.08.2007
- Summer flood changes river morphology at the restored site near Neunforn/TG.
- Deposition of fine sediments in the alluvial forest, which is flooded (in some sections more than 2 m!).
|