February 4, 2012, Saturday, 34

PMprojectde1eb4a

From SwissExperiment

PMprojectde1eb4a
Jump to: navigation, search

Project: SwissEx

Manager Ndawes
Category SwissEx, SLF, SMM, Snow and Permafrost
Project Info Workplan of the SwissEx project
Project Notes None
Actions
Edit click here.
Add tasks click here.
My tasks My user pageinfo.pngThis will only work if you are using the user info template - if not, go here; Form:User_Profile_Template_v2
Help Project management home page
Project Info
ID PMprojectde1eb4a
Namespace N/A (main)
Last edit 2-2-2011 by Ndawes
Revisions click here

Project Tasks

Project timeline

The timeline below shows all tasks defined in this project. Scroll horizontally to view tasks starting at an earlier or later date.

Use a JavaScript-enabled browser to view this element. Browse the result list directly.MONTHYEARSensorscope Station for climate EE programme2008-09-01T00:00:002009-02-28T23:59:590click here for details
Start: 1 September 2008
End: 28 February 2009
Type: task
Status: closed
Task info: Provide a SensorScope station for environmental education in Valais
Data infrastructure for APUNCH data2008-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2012
Type: task
Status: open
Task info: Implement the data infrastructure for the acquisition, storage and retrieval of APUNCH data and metadata. Deliverables: Software and a report (either a publication or web based)
Deployment of APUNCH reference raingauges2008-09-01T00:00:002009-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2009
Type: task
Status: closed
Task info: Deployment of APUNCH reference raingauges (permanent stations and SensorScope stations)
GSN operation2008-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2012
Type: task
Status: open
Task info: Ensure that GSN fulfills the requirements of the projects as far as possible and runs with a high uptime.
Seismic instrumentation in the Valais2008-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2010
Type: task
Status: open
Task info: Report on the implementation of seismic instrumentation in the fieldsites in Valais
Active control algorithms of the stations based on the annotations of a model like for example to adapt the sampling rates of a sensor station based on a model based characterization of an event2008-09-01T00:00:002011-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2011
Type: task
Status: open
Task info: Active control algorithms of the stations based on the annotations of a model like for example to adapt the sampling rates of a sensor station based on a model based characterization of an event

Deliverables: Software (Sept 10), Paper (Sept 11)
Intelligent sampling schemes2008-09-01T00:00:002011-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2011
Type: task
Status: open
Task info: Produce an intelligently sampling SensorScope station, and demonstrate how it can impact the work of environmental research: Software/firmware, test data and 1 publication
Processing strategies and tools for real-time systems related to earthquake observations2008-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2012
Type: task
Status: open
Task info: Software and a report (web based or publication) on processing strategies and tools for real-time systems related to earthquake observations
New Mechanical Design for SensorScope (including housing, connectors, frame)2008-09-01T00:00:002009-02-28T23:59:590click here for details
Start: 1 September 2008
End: 28 February 2009
Type: task
Status: closed
Task info: Develop a new design for the sensorscope system
Instruments for short-term earthquake precursors2008-09-01T00:00:002011-02-28T23:59:590click here for details
Start: 1 September 2008
End: 28 February 2011
Type: task
Status: closed
Task info: Report (web based or publication) on instruments for short-term earthquake precursors
Data infrastructure for RECORD2008-09-01T00:00:002008-11-30T23:59:590click here for details
Start: 1 September 2008
End: 30 November 2008
Type: task
Status: closed
Task info: Provide RECORD with the software and support it needs for acquiring, storing and retrieving data
GIS based interface: Description of a Web Service Interface for sensor metadata2008-09-01T00:00:002009-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2009
Type: task
Status: closed
Task info: Description of a Web Service Interface for sensor metadata
Development PermaSense 2nd Generation Network2008-09-01T00:00:002009-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2009
Type: task
Status: closed
Task info: Develop the 2nd generation PermaSense network
Prototype disdrometer software2008-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2010
Type: task
Status: closed
Task info: Develop and support software for the prototype disdrometer
LIDAR, SODAR, SensorScope field campaign2008-09-01T00:00:002009-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2009
Type: task
Status: closed
Task info: LIDAR, SODAR and SensorScope field campaign with the production of a paper.
Prototypes of radio sensors for embedded measurements of sediment transport2008-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2010
Type: task
Status: closed
Task info: Produce prototypes of radio sensors for sediment transport measurement. Deliverables: hardware and a publication
Climate EE pilot programme in Valais2008-09-01T00:00:002009-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2009
Type: task
Status: closed
Task info: Create an environmental education programme in Valais, focused around climate
Operational data exploitation software2008-09-01T00:00:002010-02-28T23:59:590click here for details
Start: 1 September 2008
End: 28 February 2010
Type: task
Status: closed
Task info: Create data exploitation software which allows efficient mining of both data and metadata
GPS instrumentation in the Valais2008-09-01T00:00:002011-02-28T23:59:590click here for details
Start: 1 September 2008
End: 28 February 2011
Type: task
Status: open
Task info: Report (web based or publication) on the implementation of GPS instrumentation in the Valais fieldsites
Multihop routing, in-network processing (data compression, verification, tagging)2008-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2010
Type: task
Status: open
Task info: Multihop routing, in-network processing (data compression, verification, tagging)

Deliverables: software and test data
Paper on SensorScope 1st Generation Experiences and Results2008-09-01T00:00:002008-12-31T23:59:590click here for details
Start: 1 September 2008
End: 31 December 2008
Type: task
Status: closed
Task info: Complete a paper on SensorScope 1st generation results an experiences
Education in Seismology: Final report2008-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2012
Type: task
Status: open
Task info: A final report (web based or publication) on the system and tools produced for education in seismology
SensorScope Stations for all CCES projects2008-09-01T00:00:002009-04-30T23:59:590click here for details
Start: 1 September 2008
End: 30 April 2009
Type: task
Status: closed
Task info: Procure and support a pool of SensorScope stations for use within the CCES projects
Development of distributed temperature sensing (DTS) applications for groundwater systems2008-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2010
Type: task
Status: closed
Task info: Develop the DTS system for applications in groundwater systems. Deliverables: software and a publication
SensorScope station for Davos schools2008-09-01T00:00:002009-05-31T23:59:590click here for details
Start: 1 September 2008
End: 31 May 2009
Type: task
Status: open
Task info: Procure a SensorScope station for the schools in Davos
Deployment and operation of high alpine field sites on Jungfraujoch and Matterhorn2008-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2012
Type: task
Status: open
Task info: Operate high alpine measurement sites on Jungfraujoch and Matterhorn
Prototype disdrometer hardware2008-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2010
Type: task
Status: closed
Task info: Develop and support protype hardware for a new disdrometer
Testing of SensorScope stations (part of calibration programme)2008-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2010
Type: task
Status: closed
Task info: Testing the SensorScope stations and producing calibrations
Generalized climate EE programme2008-09-01T00:00:002010-02-28T23:59:590click here for details
Start: 1 September 2008
End: 28 February 2010
Type: task
Status: closed
Task info: Create a generalised environmental education programme. Deliverables are a website, a notebook and a report
Installation of sediment transport experimental site (Riedbach)2008-09-01T00:00:002010-02-28T23:59:590click here for details
Start: 1 September 2008
End: 28 February 2010
Type: task
Status: closed
Task info: Installation of sediment transport experimental site (Riedbach)
Long term data and metadata management2008-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2012
Type: task
Status: open
Task info: Ensure that data and metadata are entered into the system and that the system is used for efficient data and metadata management
Multi-sensor monitoring system in the Visp area2008-09-01T00:00:002011-02-28T23:59:590click here for details
Start: 1 September 2008
End: 28 February 2011
Type: task
Status: open
Task info: Report (web based or publication) on multi-sensor monitoring system in the Visp area
Anemometer development2008-09-01T00:00:002011-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2011
Type: task
Status: open
Task info: Development of a field anemometer with no moving parts

Deliverables: (possible design and 1 redesign phases), design considerations
SensorScope 2nd Generation2008-09-01T00:00:002008-12-31T23:59:590click here for details
Start: 1 September 2008
End: 31 December 2008
Type: task
Status: closed
Task info: Complete the design and manufacture of the 2nd generation of SensorScope stations
Education in Seismology: Description of products2008-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2010
Type: task
Status: closed
Task info: A report (web based or publication) on the products produced for education in seismology
Setup of calibration and measurement team -development of test, calibration and validation procedures (EAWAG competence: soil and groundwater sensors)2008-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2010
Type: task
Status: open
Task info: Set up a calibration team to develop test, calibration and validation procedures. Deliverables: Web report in months 12 and 24
Calibrate SensorScope non-meteorological sensors2008-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2010
Type: task
Status: closed
Task info: Produce a web publication with the calibration of SensorScope non-meteorological sensors
Infrastructure for retrieving TRAMM and BigLink streaming data2008-09-01T00:00:002008-12-31T23:59:590click here for details
Start: 1 September 2008
End: 31 December 2008
Type: task
Status: closed
Task info: Complete an infrastructure capable of retrieving and storing TRAMM and BigLink streaming data
Paper on dense spatially and temporally distributed measurements from Wannengrat2008-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2010
Type: task
Status: closed
Task info: Produce a paper on the use of the SensorScope network to enhance and support measurements on Wannengrat
Integration of PermaSense into the Swiss Experiment Data Infrastructure2008-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2010
Type: task
Status: closed
Task info: Integrate Permasense data and metadata into the SwissEx infrastructure
Prototype disdrometer hardware2008-09-01T00:00:002009-02-28T23:59:590click here for details
Start: 1 September 2008
End: 28 February 2009
Type: task
Status: closed
Task info: Develop a prototype of the SPAD disdrometer hardware
Precipitation measurement campaign2008-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2010
Type: task
Status: closed
Task info: Carry out a precipitation measurement campaign and produce a paper.
SwissEx EE programme2008-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2012
Type: task
Status: open
Task info: Create a SwissEx environmental education programme with a common website
Control and publishing of non-streaming data2008-09-01T00:00:002010-02-28T23:59:590click here for details
Start: 1 September 2008
End: 28 February 2010
Type: task
Status: closed
Task info: Produce and use and infrastructure capable of efficiently storing and retrieving non-streaming data
Multi-sensor monitoring system in the Matter Valley2008-09-01T00:00:002010-02-28T23:59:590click here for details
Start: 1 September 2008
End: 28 February 2010
Type: task
Status: open
Task info: Report (web based or publication) on a multi-sensor monitoring system in the Matter Valley
Anemometer deployment, refinement and integration2008-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2010
Type: task
Status: open
Task info: Develop and refine a field anemometer with no moving parts
Industrialisation of SensorScope 2nd generation stations2008-09-01T00:00:002009-02-28T23:59:590click here for details
Start: 1 September 2008
End: 28 February 2009
Type: task
Status: closed
Task info: Industrialise the sensorscope station to a commercial quality.
Soil and groundwater sensor installation, calibration and maintenance workshops2008-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2010
Type: task
Status: open
Task info: Creation of a (web) manual and organise workshops for soil and groundwater sensor installation, calibration and maintenance. Due month 12 and 24
GIS based interface: Collection of proprietary GIS-specific schemas and database domains, provided by the project partners2008-09-01T00:00:002009-02-28T23:59:590click here for details
Start: 1 September 2008
End: 28 February 2009
Type: task
Status: closed
Task info: GIS based interface: Collection of proprietary GIS-specific schemas and database domains, provided by the project partners
Control and publishing of metadata2008-09-01T00:00:002009-02-28T23:59:590click here for details
Start: 1 September 2008
End: 28 February 2009
Type: task
Status: closed
Task info: Produce an infrastructure capable of storing metadata and publish a paper on the capabilities
GIS based interface: GUI Web Interface prototype for metadata2008-09-01T00:00:002010-06-30T23:59:590click here for details
Start: 1 September 2008
End: 30 June 2010
Type: task
Status: closed
Task info: Complete a GUI prototype for interaction with sensor data and sampled data from the projects.
Calibration of SensorScope meteorological instruments2008-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2010
Type: task
Status: open
Task info: Produce a web publication on the wiki detailing how to calibrate the SensorScope stations, and where possible, the calibrations.
Tech transfer of PermaSense technology to other Swiss Experiment projects2008-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2010
Type: task
Status: closed
Task info: Where possible transfer knowledge gained in PermaSense technology development to other SwissEx projects.
Paper on large scale interdisciplinary deployment in Valais2008-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2012
Type: task
Status: open
Task info: Carry out a large scale interdisciplinary deployment in Valais and write a paper on the interdisciplinary work.
A series of distributed, intelligent algorithms of Sensorscope stations (reactive and/or predictive version) to achieve efficient power management, collaborative intra-node and inter-node information processing2008-09-01T00:00:002011-02-28T23:59:590click here for details
Start: 1 September 2008
End: 28 February 2011
Type: task
Status: open
Task info: A series of distributed, intelligent algorithms of Sensorscope stations (reactive and/or predictive version) to achieve efficient power management, collaborative intra-node and inter-node information processing
Data infrastructure for COGEAR data2008-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2012
Type: task
Status: open
Task info: Implement the data infrastructure for the COGEAR data and metadata requirements. Deliverables: software and a report (web based or publication)
Develop Sensor Communication Protocol (sensor bus)2008-09-01T00:00:002009-02-28T23:59:590click here for details
Start: 1 September 2008
End: 28 February 2009
Type: task
Status: closed
Task info: Develop a bus communication protocol for 'daisy chaining' sensors.
Control and publishing of non-streaming data2008-09-01T00:00:002010-02-28T23:59:590click here for details
Start: 1 September 2008
End: 28 February 2010
Type: task
Status: closed
Task info: Develop a system for storage and retrieval of non-streaming data. Deliverables: Software and a paper.
Development, calibaration and test of water quality sensors, total-dissolved gas pressure probes and on-site mass spectrometers2008-09-01T00:00:002010-02-28T23:59:590click here for details
Start: 1 September 2008
End: 28 February 2010
Type: task
Status: closed
Task info: Development, calibaration and test of water quality sensors, total-dissolved gas pressure probes and on-site mass spectrometers
Generic model interface2008-09-01T00:00:002010-09-01T23:59:590click here for details
Start: 1 September 2008
End: 1 September 2010
Type: task
Status: closed
Task info: Produce a generic webservice and a plugin library for models, to allow them to retrieve data from GSN.
Meteoswiss and BAFU data (depending on access possibilities)2008-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2012
Type: task
Status: open
Task info: Make data from Meteoswiss and BAFU accessible over the SwissEx infrastructure where possible.
Integration of all data into the infrastructure2008-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2012
Type: task
Status: open
Task info: Integrate as much data as possible into the SwissEx infrastructure and get people using it. It is only worthwhile if it is used.
WP2 Milestone1: Comparison of SensorMap vs. IKA GIS interface2008-09-01T00:00:002011-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2011
Type: milestone
Status: open
Task info: Comparison of SensorMap vs. IKA GIS interface
WP3 Milestone 5: Hydromon self organising wireless network2008-09-01T00:00:002010-02-28T23:59:590click here for details
Start: 1 September 2008
End: 28 February 2010
Type: milestone
Status: closed
Task info: WP3 Milestone 1: Hydromon self organising wireless network
WP3 Milestone 1: Sensorscope 2nd generation network2008-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2010
Type: milestone
Status: closed
Task info: WP3 Milestone 1: Sensorscope 2nd generation network
WP3 Milestone 6: Sensorscope 3rd generation network2008-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2012
Type: milestone
Status: open
Task info: Sensorscope 3rd generation network
WP1 Milestone1: Integration of data2008-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2012
Type: milestone
Status: open
Task info: Integration of data
WP3 Milestone 2: Setup of Calibration and Measurement Team2008-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2010
Type: milestone
Status: open
Task info: WP3 Milestone 1: Setup of Calibration and Measurement Team
WP3 Milestone 7: Sensorscope extreme environment testing2008-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2010
Type: milestone
Status: closed
Task info: Sensorscope extreme environment testing
WP1 Milestone2: Baseline SwissEx data infrastructure completion2008-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2012
Type: milestone
Status: open
Task info: Baseline SwissEx data infrastructure completion
WP3 Milestone 8: Completion of RADAR, LIDAR and Disdrometer development2008-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2012
Type: milestone
Status: open
Task info: Completion of RADAR, LIDAR and Disdrometer development
WP1 Milestone3: Advanced infrastructure development completion2008-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2012
Type: milestone
Status: open
Task info: Advanced infrastructure development completion
WP3 Milestone 4: Permasense 2nd generation network2008-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2012
Type: milestone
Status: open
Task info: WP3 Milestone 1: Permasense 2nd generation network
WP4 Milestone 1: Integration of CCES projects into the SwissEx infrastructure2008-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2008
End: 31 August 2012
Type: milestone
Status: open
Task info: Integration of CCES projects into the SwissEx infrastructure
Energy Efficient Collaborative Routing Algorithms2008-11-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 November 2008
End: 31 August 2010
Type: task
Status: closed
Task info: Optimise the routing algorithms to allow the use of lower power systems
New Sensors in SensorScope (Disdrometer, Snow Depth)2009-02-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 February 2009
End: 31 August 2010
Type: task
Status: closed
Task info: Integrate new sensors into the SensorScope system
Infrastructure workshop2009-02-01T00:00:002009-02-28T23:59:590click here for details
Start: 1 February 2009
End: 28 February 2009
Type: task
Status: closed
Task info: Organise an infrastructure workshop
SwissEx Meeting2009-02-01T00:00:002009-02-28T23:59:590click here for details
Start: 1 February 2009
End: 28 February 2009
Type: task
Status: closed
Task info: SwissEx General Meeting
Long-Range Communication Module2009-02-01T00:00:002010-02-28T23:59:590click here for details
Start: 1 February 2009
End: 28 February 2010
Type: task
Status: closed
Task info: Make SensorScope stations capable of inter-node communication over 'long' distances (km)
Routing Algorithms for Long Range Communication2009-02-01T00:00:002010-02-28T23:59:590click here for details
Start: 1 February 2009
End: 28 February 2010
Type: task
Status: closed
Task info: Develop routing algorithms to optimise long range communications
Mobile radar field campaign2009-02-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 February 2009
End: 31 August 2012
Type: task
Status: closed
Task info: Conduct a mobile radar field campaign
Develop Camera System for SensorScope2009-02-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 February 2009
End: 31 August 2010
Type: task
Status: closed
Task info: Integrate a good quality webcam into the SensorScope system.
GIS based interface: Unification of the schemas and database domains, Planning a distributed GIS metadata model using Web Services2009-02-01T00:00:002009-08-31T23:59:590click here for details
Start: 1 February 2009
End: 31 August 2009
Type: task
Status: closed
Task info: Unification of the schemas and database domains, Planning a distributed GIS metadata model using Web Services
WP3 Milestone 3: Long distance communications links2009-02-01T00:00:002010-02-01T23:59:590click here for details
Start: 1 February 2009
End: 1 February 2010
Type: milestone
Status: closed
Task info: WP3 Milestone 1: Long distance communications links
Hydromon data analysis package2009-03-01T00:00:002010-02-28T23:59:590click here for details
Start: 1 March 2009
End: 28 February 2010
Type: task
Status: closed
Task info: Develop a data analysis package for the Hydromon sensor network
Paper on SensorScope 2nd Generation Network2009-04-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 April 2009
End: 31 August 2010
Type: task
Status: closed
Task info: Write a paper on the 2nd Generation SensorScope hardware and experience in its deployments
SensorScope Testbed in Wannengrat2009-04-01T00:00:002010-04-30T23:59:590click here for details
Start: 1 April 2009
End: 30 April 2010
Type: task
Status: closed
Task info: Deploy and support a SensorScope deployment on Wannengrat
SensorScope 3rd Generation2009-05-01T00:00:002011-08-31T23:59:590click here for details
Start: 1 May 2009
End: 31 August 2011
Type: task
Status: open
Task info: Develop the 3rd generation of the SensorScope system
SwissEx Meeting2009-07-01T00:00:002009-08-31T23:59:590click here for details
Start: 1 July 2009
End: 31 August 2009
Type: task
Status: closed
Task info: SwissEx General Meeting
Data infrastructure for Mountland, Majolica and APUNCH streaming data2009-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2009
End: 31 August 2010
Type: task
Status: closed
Task info: Produce a data infrastructure capable of retrieving Mountland, Majolica and APUNCH streaming data
Sensorscope station deployment and soil sensor calibration for APUNCH2009-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2009
End: 31 August 2012
Type: task
Status: closed
Task info: Provide APUNCH with deployment support in SensorScope station deployment and sensor calibration
GIS based interface: Implementation of a Web Service Interface for available sensor metadata of the project partners2009-09-01T00:00:002010-02-28T23:59:590click here for details
Start: 1 September 2009
End: 28 February 2010
Type: task
Status: closed
Task info: Data from COGEAR successfully imported. Data from GSN is a separate task.
Sediment transport experiments2009-09-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 September 2009
End: 31 August 2010
Type: task
Status: closed
Task info: Sediment transport experiments. Deliverables: methodology publication
Remote Network Management and Reconfiguration2009-09-01T00:00:002011-08-31T23:59:590click here for details
Start: 1 September 2009
End: 31 August 2011
Type: task
Status: open
Task info: Develop a system for remote network management and reconfiguration
Automated, event-driven sampling schemes for water-quality issues2009-09-01T00:00:002011-08-31T23:59:590click here for details
Start: 1 September 2009
End: 31 August 2011
Type: task
Status: open
Task info: Develop event driven sampling schemes for water quality monitoring:Software/firmware, test data, 1 publication
Automatic In-Network QA/QC2009-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2009
End: 31 August 2012
Type: task
Status: open
Task info: Develop an algorithm and infrastructure to allow automated, in-network data quality assessment.
GIS based interface: Maintenance2009-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2009
End: 31 August 2012
Type: task
Status: open
Task info: Maintenance of the GIS based interface
Disdrometer prototype deployment2009-10-01T00:00:002010-06-30T23:59:590click here for details
Start: 1 October 2009
End: 30 June 2010
Type: task
Status: closed
Task info: Deploy a prototype of the new disdrometer
Network Monitoring Tool2009-12-01T00:00:002010-11-30T23:59:590click here for details
Start: 1 December 2009
End: 30 November 2010
Type: task
Status: open
Task info: Create a network monitoring tool to work with the remote network monitoring task
SwissEx Meeting2010-01-01T00:00:002010-02-28T23:59:590click here for details
Start: 1 January 2010
End: 28 February 2010
Type: task
Status: closed
Task info: SwissEx General Meeting
WP4 Milestone 2: Precipitation measurement campaign in alpine terrain2010-01-01T00:00:002011-02-28T23:59:590click here for details
Start: 1 January 2010
End: 28 February 2011
Type: milestone
Status: open
Task info: Precipitation measurement campaign in alpine terrain
Procedure for inference of statistical and scaling properties of precipitation data2010-02-01T00:00:002011-02-28T23:59:590click here for details
Start: 1 February 2010
End: 28 February 2011
Type: task
Status: open
Task info: Procedure for inference of statistical and scaling properties of precipitation data. Deliverables: Methodology publication and software.
Infrastructure workshop2010-02-01T00:00:002010-02-28T23:59:590click here for details
Start: 1 February 2010
End: 28 February 2010
Type: task
Status: closed
Task info: Organise an infrastructure workshop
Calibration of X-Band radar2010-02-01T00:00:002011-02-28T23:59:590click here for details
Start: 1 February 2010
End: 28 February 2011
Type: task
Status: open
Task info: Calibration of X-Band radar. Deliverables: methodology and publication
GIS based interface: Alignment of the Web Service Interface with the general SwissEx Metadata Model, Adaptations of the Web Service Interface2010-02-01T00:00:002010-04-30T23:59:590click here for details
Start: 1 February 2010
End: 30 April 2010
Type: task
Status: closed
Task info: Adapt the web service interface to pull sensor metadata from databases of project partners
Rainfall data disaggregation techniques2010-02-01T00:00:002010-02-28T23:59:590click here for details
Start: 1 February 2010
End: 28 February 2010
Type: task
Status: open
Task info: Rainfall data disaggregation techniques methodology publication and software
Fusion of streaming data with sampled data2010-02-28T00:00:002011-08-31T23:59:590click here for details
Start: 28 February 2010
End: 31 August 2011
Type: task
Status: open
Task info: Join the streaming data with the manually sampled data and provide systems for mining and jointly displaying both. Deliverables: Publication
Installation of GPS station for water vapour tomography2010-02-28T00:00:002010-08-31T23:59:590click here for details
Start: 28 February 2010
End: 31 August 2010
Type: task
Status: open
Task info: Installation of GPS station for water vapour tomography
GIS based interface: Implementation of the Web Service Interface for first incoming sensor data of the project partners2010-04-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 April 2010
End: 31 August 2010
Type: task
Status: closed
Task info: Implement the web service interface for the sensor data of partners.
CCES Status report 2010 compilation2010-07-01T00:00:002010-07-23T23:59:590click here for details
Start: 1 July 2010
End: 23 July 2010
Type: task
Status: closed
Task info: Compilation of SwissEx section of 2010 CCES status report
Provision of Year 2 progress text to Nick2010-07-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 July 2010
End: 31 August 2010
Type: task
Status: closed
Task info: Just text not finances for period September 2009 to September 2010
GIS based interface: Implementation of cartographic tools for visual data mining2010-07-01T00:00:002011-05-31T23:59:590click here for details
Start: 1 July 2010
End: 31 May 2011
Type: task
Status: open
Task info: Implementation of data mining tools.
GIS based interface: Interface description for accessing available sensor data of the project partners using Web Services2010-07-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 July 2010
End: 31 August 2010
Type: task
Status: closed
Task info: Document the GIS based interface for visualisation and access to data from partners.
GIS based interface: Web Service Interface implementation progress report for available sensor data of the project partners2010-08-01T00:00:002010-08-31T23:59:590click here for details
Start: 1 August 2010
End: 31 August 2010
Type: task
Status: closed
Task info: Produce a progress report on the implementation of the sensor data web service interface
Provision of Year 2 finances to Nick2010-09-01T00:00:002010-10-31T23:59:590click here for details
Start: 1 September 2010
End: 31 October 2010
Type: task
Status: closed
Task info: Provision of finances for the period 1st September 2009 to 31st August 2010 to Nick
Rainfall field estimation from combination of radar and raingauge observations2010-09-01T00:00:002011-08-31T23:59:590click here for details
Start: 1 September 2010
End: 31 August 2011
Type: task
Status: open
Task info: Rainfall field estimation from combination of radar and raingauge observations. Deliverables: methodology and publication
GIS based interface: Final version of the GUI Web Interface, Bug fixing2010-09-01T00:00:002011-08-31T23:59:590click here for details
Start: 1 September 2010
End: 31 August 2011
Type: task
Status: open
Task info: Creation of the final version of the GUI web interface
Paper on characterisation of annotations on a data model2010-09-01T00:00:002011-08-31T23:59:590click here for details
Start: 1 September 2010
End: 31 August 2011
Type: task
Status: open
Task info: Produce a paper on the characterisation of annotations on a data model
Submission of year 2 report2010-11-01T00:00:002010-11-05T23:59:590click here for details
Start: 1 November 2010
End: 5 November 2010
Type: task
Status: closed
Task info: Compilation and submission of year 2 report
Latsis Symposium2010-11-15T00:00:002010-11-17T23:59:590click here for details
Start: 15 November 2010
End: 17 November 2010
Type: task
Status: closed
Task info: Compulsory conference for all groups within SwissEx, held at the ETH main building. All CCES projects will be participating.
CCES 2010 Assessment2010-11-17T00:00:002010-11-19T23:59:590click here for details
Start: 17 November 2010
End: 19 November 2010
Type: task
Status: closed
Task info: Assessment of the project by the ETH board as in 2008.
Paper on SensorScope 3rd Generation Network2011-01-01T00:00:002011-08-31T23:59:590click here for details
Start: 1 January 2011
End: 31 August 2011
Type: task
Status: open
Task info: Write a paper on the 3rd generation SensorScope system
SwissEx Meeting2011-01-01T00:00:002011-02-28T23:59:590click here for details
Start: 1 January 2011
End: 28 February 2011
Type: task
Status: closed
Task info: SwissEx General Meeting
Infrastructure workshop2011-02-01T00:00:002011-02-28T23:59:590click here for details
Start: 1 February 2011
End: 28 February 2011
Type: task
Status: open
Task info: Organise an infrastructure workshop
Provision of Year 3 progress text to Nick2011-07-01T00:00:002011-08-31T23:59:590click here for details
Start: 1 July 2011
End: 31 August 2011
Type: task
Status: open
Task info: Just text not finances for period September 2010 to September 2011
SwissEx Meeting2011-07-01T00:00:002011-08-31T23:59:590click here for details
Start: 1 July 2011
End: 31 August 2011
Type: task
Status: closed
Task info: SwissEx General Meeting
Organization of a summer research institute in conjunction with a technical workshop on long-term remote sensing2011-08-01T00:00:002011-08-31T23:59:590click here for details
Start: 1 August 2011
End: 31 August 2011
Type: task
Status: open
Task info: Organization of a summer research institute in conjunction with a technical workshop on long-term remote sensing
Provision of Year 3 finances to Nick2011-09-01T00:00:002011-10-31T23:59:590click here for details
Start: 1 September 2011
End: 31 October 2011
Type: task
Status: open
Task info: Provision of finances for the period 1st September 2010 to 31st August 2011 to Nick
WP4 Milestone 3: Vispa catchment measurement campaign2011-09-01T00:00:002012-08-31T23:59:590click here for details
Start: 1 September 2011
End: 31 August 2012
Type: milestone
Status: open
Task info: Vispa catchment measurement campaign
Submission of year 3 report2011-11-01T00:00:002011-11-05T23:59:590click here for details
Start: 1 November 2011
End: 5 November 2011
Type: task
Status: open
Task info: Compilation and submission of year 3 report
SwissEx Meeting2012-01-01T00:00:002012-02-28T23:59:590click here for details
Start: 1 January 2012
End: 28 February 2012
Type: task
Status: open
Task info: SwissEx General Meeting



Active items list

The table below shows all open items starting before today. Overdue tasks are highlighted in red.

Project Task Type Dates Complete Who
SwissEx SensorScope station for Davos schools (PMtaskba0896d) task 1 September 2008 to 31 May 2009 0 % Lehning, Ndawes
SwissEx Multi-sensor monitoring system in the Matter Valley (PMtasked97764) task 1 September 2008 to 28 February 2010 0 % Donat.faeh
SwissEx Rainfall data disaggregation techniques (PMtask1a29ddc) task 1 February 2010 to 28 February 2010 0 % Dfinger, Pburlando
SwissEx Installation of GPS station for water vapour tomography (PMtask728719d) task 28 February 2010 to 31 August 2010 0 % Dfinger, Pburlando
SwissEx Multihop routing, in-network processing (data compression, verification, tagging) (PMtaske23f1f5) task 1 September 2008 to 31 August 2010 0 % Alexander.bahr, Alcherio, Gbarrene
SwissEx Calibration of SensorScope meteorological instruments (PMtask3c219b1) task 1 September 2008 to 31 August 2010 0 % Ndawes, Lehning, Bavay
SwissEx Anemometer deployment, refinement and integration (PMtask0913c7b) task 1 September 2008 to 31 August 2010 0 % Alexander.bahr, Alcherio, Gbarrene
SwissEx Setup of calibration and measurement team -development of test, calibration and validation procedures (EAWAG competence: soil and groundwater sensors) (PMtask8b6b33b) task 1 September 2008 to 31 August 2010 20 % Philipp.schneider, Mario.schirmer
SwissEx WP3 Milestone 2: Setup of Calibration and Measurement Team (PMtask7e67a31) milestone 1 September 2008 to 31 August 2010 50 % Ndawes, Lehning
SwissEx Seismic instrumentation in the Valais (PMtask4d18587) task 1 September 2008 to 31 August 2010 50 % Donat.faeh
SwissEx Soil and groundwater sensor installation, calibration and maintenance workshops (PMtask63c355d) task 1 September 2008 to 31 August 2010 80 % Philipp.schneider, Mario.schirmer
SwissEx Network Monitoring Tool (PMtask8666375) task 1 December 2009 to 30 November 2010 0 % Gbarrene
SwissEx Multi-sensor monitoring system in the Visp area (PMtask812db6d) task 1 September 2008 to 28 February 2011 0 % Donat.faeh
SwissEx Procedure for inference of statistical and scaling properties of precipitation data (PMtaskaf03578) task 1 February 2010 to 28 February 2011 0 % Dfinger, Pburlando
SwissEx Calibration of X-Band radar (PMtask9f5f402) task 1 February 2010 to 28 February 2011 0 % Dfinger, Pburlando, Msavina
SwissEx Infrastructure workshop (PMtaskc735117) task 1 February 2011 to 28 February 2011 0 % Ndawes, Lehning
SwissEx A series of distributed, intelligent algorithms of Sensorscope stations (reactive and/or predictive version) to achieve efficient power management, collaborative intra-node and inter-node information processing (PMtaskc54c1f0) task 1 September 2008 to 28 February 2011 40 % Alexander.bahr, Alcherio
SwissEx WP4 Milestone 2: Precipitation measurement campaign in alpine terrain (PMtask7e67a50) milestone 1 January 2010 to 28 February 2011 50 % Ndawes, Lehning
SwissEx GPS instrumentation in the Valais (PMtaskfa38d2e) task 1 September 2008 to 28 February 2011 60 % Donat.faeh
SwissEx GIS based interface: Implementation of cartographic tools for visual data mining (PMtask6e4cdf8) task 1 July 2010 to 31 May 2011 0 % Ionut.iosifescu, Lhurni
SwissEx Paper on characterisation of annotations on a data model (PMtaskfb3df06) task 1 September 2010 to 31 August 2011 0 % Ndawes, Lehning
SwissEx Paper on SensorScope 3rd Generation Network (PMtask3729937) task 1 January 2011 to 31 August 2011 0 % Gbarrene
SwissEx Remote Network Management and Reconfiguration (PMtaskf2dad21) task 1 September 2009 to 31 August 2011 0 % Gbarrene
SwissEx GIS based interface: Final version of the GUI Web Interface, Bug fixing (PMtask28a20ae) task 1 September 2010 to 31 August 2011 0 % Ionut.iosifescu, Lhurni
SwissEx Provision of Year 3 progress text to Nick (PMtask1120f68) task 1 July 2011 to 31 August 2011 0 % Ndawes, Aberer, Aberne, Alcherio, Alexander.bahr, Beutel, Charbon, Donat.faeh, Dfinger, Gbarrene, Hoyoung Jeung, Ionut.iosifescu, Lehning, Marc.schneebeli, Mario.schirmer, Pburlando, Vluyet
SwissEx Rainfall field estimation from combination of radar and raingauge observations (PMtaskd72727b) task 1 September 2010 to 31 August 2011 0 % Dfinger, Pburlando
SwissEx Automated, event-driven sampling schemes for water-quality issues (PMtask5578c43) task 1 September 2009 to 31 August 2011 0 % Alexander.bahr, Alcherio
SwissEx Organization of a summer research institute in conjunction with a technical workshop on long-term remote sensing (PMtask94a6438) task 1 August 2011 to 31 August 2011 10 % Beutel
SwissEx SensorScope 3rd Generation (PMtask8b6ac21) task 1 May 2009 to 31 August 2011 20 % Gbarrene
SwissEx Intelligent sampling schemes (PMtask82e79ac) task 1 September 2008 to 31 August 2011 30 % Alexander.bahr, Alcherio
SwissEx Anemometer development (PMtask6ef4168) task 1 September 2008 to 31 August 2011 40 % Alexander.bahr, Alcherio
SwissEx Active control algorithms of the stations based on the annotations of a model like for example to adapt the sampling rates of a sensor station based on a model based characterization of an event (PMtask632c0ca) task 1 September 2008 to 31 August 2011 40 % Alexander.bahr, Alcherio
SwissEx Fusion of streaming data with sampled data (PMtask2982757) task 28 February 2010 to 31 August 2011 50 % Mario.schirmer, Philipp.schneider
SwissEx WP2 Milestone1: Comparison of SensorMap vs. IKA GIS interface (PMtask61b7f53) milestone 1 September 2008 to 31 August 2011 70 % Ndawes, Lehning
SwissEx Provision of Year 3 finances to Nick (PMtask7d59064) task 1 September 2011 to 31 October 2011 0 % Ndawes, Aberer, Aberne, Alcherio, Alexander.bahr, Beutel, Charbon, Donat.faeh, Dfinger, Gbarrene, Hoyoung Jeung, Ionut.iosifescu, Lehning, Marc.schneebeli, Mario.schirmer, Pburlando, Vluyet
SwissEx Submission of year 3 report (PMtask9b5d6ee) task 1 November 2011 to 5 November 2011 0 % Ndawes
SwissEx SwissEx Meeting (PMtask633c29i) task 1 January 2012 to 28 February 2012 0 % Lehning, Ndawes
SwissEx Processing strategies and tools for real-time systems related to earthquake observations (PMtask3b949ca) task 1 September 2008 to 31 August 2012 0 % Donat.faeh
SwissEx Paper on large scale interdisciplinary deployment in Valais (PMtaskd037632) task 1 September 2008 to 31 August 2012 0 % Vluyet
SwissEx Education in Seismology: Final report (PMtask7b9a01e) task 1 September 2008 to 31 August 2012 0 % Donat.faeh
SwissEx Automatic In-Network QA/QC (PMtask3c84315) task 1 September 2009 to 31 August 2012 0 % Gbarrene
SwissEx SwissEx EE programme (PMtask71a77c8) task 1 September 2008 to 31 August 2012 0 % Vluyet, Asornette, Donat.faeh, Gbarrene
SwissEx WP3 Milestone 6: Sensorscope 3rd generation network (PMtask7e67a35) milestone 1 September 2008 to 31 August 2012 20 % Ndawes, Lehning
SwissEx Meteoswiss and BAFU data (depending on access possibilities) (PMtask351b75f) task 1 September 2008 to 31 August 2012 20 % Ndawes, Lehning
SwissEx Data infrastructure for COGEAR data (PMtask187cd5d) task 1 September 2008 to 31 August 2012 20 % Donat.faeh
SwissEx GIS based interface: Maintenance (PMtaske316dda) task 1 September 2009 to 31 August 2012 25 % Ionut.iosifescu, Lhurni
SwissEx WP1 Milestone1: Integration of data (PMtask61b7f50) milestone 1 September 2008 to 31 August 2012 30 % Ndawes, Lehning
SwissEx WP1 Milestone3: Advanced infrastructure development completion (PMtask61b7f52) milestone 1 September 2008 to 31 August 2012 30 % Ndawes, Lehning
SwissEx Integration of all data into the infrastructure (PMtaskf8d548f) task 1 September 2008 to 31 August 2012 30 % Ndawes, Lehning
SwissEx Long term data and metadata management (PMtaskf68c35d) task 1 September 2008 to 31 August 2012 40 % Aberer, Hoyoung Jeung
SwissEx WP3 Milestone 8: Completion of RADAR, LIDAR and Disdrometer development (PMtask7e67a37) milestone 1 September 2008 to 31 August 2012 50 % Ndawes, Lehning
SwissEx WP4 Milestone 1: Integration of CCES projects into the SwissEx infrastructure (PMtask7e67a38) milestone 1 September 2008 to 31 August 2012 50 % Ndawes, Lehning
SwissEx WP3 Milestone 4: Permasense 2nd generation network (PMtask7e67a33) milestone 1 September 2008 to 31 August 2012 50 % Ndawes, Lehning
SwissEx WP4 Milestone 3: Vispa catchment measurement campaign (PMtask7e67a51) milestone 1 September 2011 to 31 August 2012 50 % Ndawes, Lehning
SwissEx GSN operation (PMtask263e68f) task 1 September 2008 to 31 August 2012 50 % Hoyoung Jeung, Aberer
SwissEx Deployment and operation of high alpine field sites on Jungfraujoch and Matterhorn (PMtasked7da56) task 1 September 2008 to 31 August 2012 50 % Beutel
SwissEx Data infrastructure for APUNCH data (PMtask2930f13) task 1 September 2008 to 31 August 2012 70 % Dfinger, Pburlando
SwissEx WP1 Milestone2: Baseline SwissEx data infrastructure completion (PMtask61b7f51) milestone 1 September 2008 to 31 August 2012 80 % Ndawes, Lehning



Pending tasks

The table below shows all tasks due to start after today.



Completed tasks

The table below shows all completed tasks (task closed, regardless of start or end date or completion percent.)


Project Task Type Dates Complete Who
SwissEx Data infrastructure for RECORD (PMtask54967c8) task 1 September 2008 to 30 November 2008 100 % Philipp.schneider, Mario.schirmer
SwissEx Paper on SensorScope 1st Generation Experiences and Results (PMtask22bf9b5) task 1 September 2008 to 31 December 2008 100 % Gbarrene, Vluyet
SwissEx SensorScope 2nd Generation (PMtask86df960) task 1 September 2008 to 31 December 2008 100 % Gbarrene
SwissEx Infrastructure for retrieving TRAMM and BigLink streaming data (PMtaskd3a7d7c) task 1 September 2008 to 31 December 2008 100 % Ndawes, Lehning, Hoyoung Jeung, Aberer
SwissEx GIS based interface: Collection of proprietary GIS-specific schemas and database domains, provided by the project partners (PMtask8aa5772) task 1 September 2008 to 28 February 2009 100 % Lhurni, Ionut.iosifescu
SwissEx Industrialisation of SensorScope 2nd generation stations (PMtaskbae3388) task 1 September 2008 to 28 February 2009 100 % Gbarrene
SwissEx Infrastructure workshop (PMtaske486fc6) task 1 February 2009 to 28 February 2009 100 % Ndawes, Lehning, Hoyoung Jeung, Aberer, Mario.schirmer, Philipp.schneider
SwissEx Control and publishing of metadata (PMtaskd34b22a) task 1 September 2008 to 28 February 2009 100 % Ndawes, Lehning, Hoyoung Jeung, Aberer
SwissEx Sensorscope Station for climate EE programme (PMtask3895c32) task 1 September 2008 to 28 February 2009 100 % Vluyet, Gbarrene
SwissEx Develop Sensor Communication Protocol (sensor bus) (PMtask181bc0e) task 1 September 2008 to 28 February 2009 100 % Gbarrene
SwissEx Prototype disdrometer hardware (PMtask37e4f0f) task 1 September 2008 to 28 February 2009 100 % Charbon
SwissEx New Mechanical Design for SensorScope (including housing, connectors, frame) (PMtask36084af) task 1 September 2008 to 28 February 2009 100 % Gbarrene
SwissEx SwissEx Meeting (PMtask633c29f) task 1 February 2009 to 28 February 2009 100 % Lehning, Ndawes
SwissEx SensorScope Stations for all CCES projects (PMtaskee74831) task 1 September 2008 to 30 April 2009 100 % Gbarrene, Ndawes, Lehning
SwissEx Deployment of APUNCH reference raingauges (PMtask3cc6172) task 1 September 2008 to 31 August 2009 100 % Dfinger, Pburlando
SwissEx Development PermaSense 2nd Generation Network (PMtask7dd1dc1) task 1 September 2008 to 31 August 2009 100 % Beutel
SwissEx GIS based interface: Unification of the schemas and database domains, Planning a distributed GIS metadata model using Web Services (PMtaskac637d9) task 1 February 2009 to 31 August 2009 100 % Ionut.iosifescu, Lhurni
SwissEx LIDAR, SODAR, SensorScope field campaign (PMtask6dbecdc) task 1 September 2008 to 31 August 2009 100 % Vluyet, Gbarrene
SwissEx GIS based interface: Description of a Web Service Interface for sensor metadata (PMtask50b3b55) task 1 September 2008 to 31 August 2009 100 % Ionut.iosifescu, Lhurni
SwissEx Climate EE pilot programme in Valais (PMtask09ae907) task 1 September 2008 to 31 August 2009 100 % Vluyet
SwissEx SwissEx Meeting (PMtask633c29g) task 1 July 2009 to 31 August 2009 100 % Lehning, Ndawes
SwissEx WP3 Milestone 3: Long distance communications links (PMtask7e67a32) milestone 1 February 2009 to 1 February 2010 100 % Ndawes, Lehning
SwissEx SwissEx Meeting (PMtask633c29k) task 1 January 2010 to 28 February 2010 0 % Lehning, Ndawes
SwissEx Infrastructure workshop (PMtaskc735116) task 1 February 2010 to 28 February 2010 50 % Ndawes, Lehning
SwissEx WP3 Milestone 5: Hydromon self organising wireless network (PMtask7e67a34) milestone 1 September 2008 to 28 February 2010 100 % Ndawes, Lehning
SwissEx Development, calibaration and test of water quality sensors, total-dissolved gas pressure probes and on-site mass spectrometers (PMtask1450fa7) task 1 September 2008 to 28 February 2010 100 % Philipp.schneider, Mario.schirmer
SwissEx Operational data exploitation software (PMtaskf52d25c) task 1 September 2008 to 28 February 2010 100 % Hoyoung Jeung, Aberer, Ndawes, Lehning
SwissEx Routing Algorithms for Long Range Communication (PMtaskf5f8040) task 1 February 2009 to 28 February 2010 100 % Gbarrene, Alcherio, Alexander.bahr
SwissEx Installation of sediment transport experimental site (Riedbach) (PMtaskb4439fd) task 1 September 2008 to 28 February 2010 100 % Dfinger, Pburlando
SwissEx Control and publishing of non-streaming data (PMtask95c787c) task 1 September 2008 to 28 February 2010 100 % Hoyoung Jeung, Aberer
SwissEx Hydromon data analysis package (PMtaska8e51d1) task 1 March 2009 to 28 February 2010 100 % Charbon
SwissEx Control and publishing of non-streaming data (PMtask35520cc) task 1 September 2008 to 28 February 2010 100 % Mario.schirmer, Philipp.schneider
SwissEx GIS based interface: Implementation of a Web Service Interface for available sensor metadata of the project partners (PMtask750d0a4) task 1 September 2009 to 28 February 2010 100 % Ionut.iosifescu, Lhurni
SwissEx Generalized climate EE programme (PMtask7dbd21d) task 1 September 2008 to 28 February 2010 100 % Vluyet
SwissEx Long-Range Communication Module (PMtaskdb21bf0) task 1 February 2009 to 28 February 2010 100 % Gbarrene
SwissEx GIS based interface: Alignment of the Web Service Interface with the general SwissEx Metadata Model, Adaptations of the Web Service Interface (PMtask23a58b8) task 1 February 2010 to 30 April 2010 50 % Ionut.iosifescu, Lhurni
SwissEx SensorScope Testbed in Wannengrat (PMtaskfdba802) task 1 April 2009 to 30 April 2010 100 % Gbarrene, Ndawes, Lehning
SwissEx GIS based interface: GUI Web Interface prototype for metadata (PMtaskb2e8ec5) task 1 September 2008 to 30 June 2010 100 % Ionut.iosifescu, Lhurni
SwissEx Disdrometer prototype deployment (PMtask208154f) task 1 October 2009 to 30 June 2010 100 % Vluyet, Gbarrene, Aberne, Charbon, Alain.berthoud
SwissEx CCES Status report 2010 compilation (PMtask1665c3f) task 1 July 2010 to 23 July 2010 100 % Ndawes
SwissEx WP3 Milestone 7: Sensorscope extreme environment testing (PMtask7e67a36) milestone 1 September 2008 to 31 August 2010 100 % Ndawes, Lehning
SwissEx WP3 Milestone 1: Sensorscope 2nd generation network (PMtask7e67a39) milestone 1 September 2008 to 31 August 2010 100 % Ndawes, Lehning
SwissEx Prototype disdrometer hardware (PMtask53bd52b) task 1 September 2008 to 31 August 2010 100 % Charbon, Aberne, Alain.berthoud
SwissEx Provision of Year 2 progress text to Nick (PMtask676eb8b) task 1 July 2010 to 31 August 2010 100 % Ndawes, Aberer, Aberne, Alcherio, Alexander.bahr, Beutel, Charbon, Donat.faeh, Dfinger, Gbarrene, Hoyoung Jeung, Ionut.iosifescu, Lehning, Marc.schneebeli, Mario.schirmer, Pburlando, Vluyet
SwissEx Integration of PermaSense into the Swiss Experiment Data Infrastructure (PMtask3540480) task 1 September 2008 to 31 August 2010 100 % Beutel
SwissEx Paper on SensorScope 2nd Generation Network (PMtask592b160) task 1 April 2009 to 31 August 2010 100 % Gbarrene
SwissEx GIS based interface: Interface description for accessing available sensor data of the project partners using Web Services (PMtask6db7037) task 1 July 2010 to 31 August 2010 100 % Ionut.iosifescu, Lhurni
SwissEx Develop Camera System for SensorScope (PMtask1f9ef9b) task 1 February 2009 to 31 August 2010 100 % Gbarrene
SwissEx Sediment transport experiments (PMtaskd982c68) task 1 September 2009 to 31 August 2010 100 % Dfinger, Pburlando
SwissEx Data infrastructure for Mountland, Majolica and APUNCH streaming data (PMtask9a9d5dd) task 1 September 2009 to 31 August 2010 100 % Ndawes, Lehning
SwissEx Tech transfer of PermaSense technology to other Swiss Experiment projects (PMtaska2e628a) task 1 September 2008 to 31 August 2010 100 % Beutel
SwissEx Education in Seismology: Description of products (PMtask064f4ad) task 1 September 2008 to 31 August 2010 100 % Donat.faeh
SwissEx GIS based interface: Implementation of the Web Service Interface for first incoming sensor data of the project partners (PMtask1b2e152) task 1 April 2010 to 31 August 2010 100 % Ionut.iosifescu, Lhurni
SwissEx New Sensors in SensorScope (Disdrometer, Snow Depth) (PMtask7ffd4b0) task 1 February 2009 to 31 August 2010 100 % Gbarrene
SwissEx Testing of SensorScope stations (part of calibration programme) (PMtask63716e5) task 1 September 2008 to 31 August 2010 100 % Vluyet, Gbarrene
SwissEx Energy Efficient Collaborative Routing Algorithms (PMtask5ae4d21) task 1 November 2008 to 31 August 2010 100 % Gbarrene, Alcherio, Alexander.bahr
SwissEx Prototypes of radio sensors for embedded measurements of sediment transport (PMtaskc4a28a4) task 1 September 2008 to 31 August 2010 100 % Dfinger, Pburlando
SwissEx Calibrate SensorScope non-meteorological sensors (PMtaska8180e4) task 1 September 2008 to 31 August 2010 100 % Philipp.schneider, Mario.schirmer
SwissEx Paper on dense spatially and temporally distributed measurements from Wannengrat (PMtask075930f) task 1 September 2008 to 31 August 2010 100 % Ndawes, Lehning, Bavay
SwissEx Prototype disdrometer software (PMtask43d176d) task 1 September 2008 to 31 August 2010 100 % Charbon, Aberne, Alain.berthoud
SwissEx Development of distributed temperature sensing (DTS) applications for groundwater systems (PMtask6a6b9fb) task 1 September 2008 to 31 August 2010 100 % Philipp.schneider, Mario.schirmer
SwissEx GIS based interface: Web Service Interface implementation progress report for available sensor data of the project partners (PMtask096ba06) task 1 August 2010 to 31 August 2010 100 % Ionut.iosifescu, Lhurni
SwissEx Precipitation measurement campaign (PMtask268e1e2) task 1 September 2008 to 31 August 2010 100 % Vluyet, Gbarrene
SwissEx Generic model interface (PMtask6cf5de2) task 1 September 2008 to 1 September 2010 100 % Ndawes, Lehning, Hoyoung Jeung, Aberer, Bavay
SwissEx Provision of Year 2 finances to Nick (PMtask511affa) task 1 September 2010 to 31 October 2010 100 % Ndawes, Aberer, Aberne, Alcherio, Alexander.bahr, Beutel, Charbon, Donat.faeh, Dfinger, Gbarrene, Hoyoung Jeung, Ionut.iosifescu, Lehning, Marc.schneebeli, Mario.schirmer, Pburlando, Vluyet
SwissEx Submission of year 2 report (PMtaskd91345f) task 1 November 2010 to 5 November 2010 100 % Ndawes
SwissEx Latsis Symposium (PMtaska5f559f) task 15 November 2010 to 17 November 2010 100 % Ndawes, Aberer, Aberne, Alcherio, Alexander.bahr, Beutel, Charbon, Donat.faeh, Dfinger, Gbarrene, Hoyoung Jeung, Ionut.iosifescu, Lehning, Marc.schneebeli, Mario.schirmer, Pburlando, Vluyet, Andy.clifton
SwissEx CCES 2010 Assessment (PMtaskbc4df96) task 17 November 2010 to 19 November 2010 100 % Ndawes, Lehning
SwissEx SwissEx Meeting (PMtask633c29j) task 1 January 2011 to 28 February 2011 0 % Lehning, Ndawes
SwissEx Instruments for short-term earthquake precursors (PMtask84d9d13) task 1 September 2008 to 28 February 2011 0 % Donat.faeh
SwissEx SwissEx Meeting (PMtask633c29h) task 1 July 2011 to 31 August 2011 100 % Lehning, Ndawes
SwissEx Mobile radar field campaign (PMtask8b2b59e) task 1 February 2009 to 31 August 2012 100 % Vluyet, Aberne, Marc.schneebeli
SwissEx Sensorscope station deployment and soil sensor calibration for APUNCH (PMtask518b0e7) task 1 September 2009 to 31 August 2012 100 % Mario.schirmer, Philipp.schneider


This online tool aims to reflect and enhance the information contained in the SwissEx Workplan