PMprojectde1eb4aFrom SwissExperimentPMprojectde1eb4a
Project: SwissEx
Project TasksProject timelineThe timeline below shows all tasks defined in this project. Scroll horizontally to view tasks starting at an earlier or later date. Use a JavaScript-enabled browser to view this element. Browse the result list directly.MONTHYEARSensorscope Station for climate EE programme2008-09-01T00:00:002009-02-28T23:59:590click here for details
Start: 1 September 2008 End: 28 February 2009 Type: task Status: closed Task info: Provide a SensorScope station for environmental education in Valais Data infrastructure for APUNCH data2008-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2012 Type: task Status: open Task info: Implement the data infrastructure for the acquisition, storage and retrieval of APUNCH data and metadata. Deliverables: Software and a report (either a publication or web based) Deployment of APUNCH reference raingauges2008-09-01T00:00:002009-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2009 Type: task Status: closed Task info: Deployment of APUNCH reference raingauges (permanent stations and SensorScope stations) GSN operation2008-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2012 Type: task Status: open Task info: Ensure that GSN fulfills the requirements of the projects as far as possible and runs with a high uptime. Seismic instrumentation in the Valais2008-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2010 Type: task Status: open Task info: Report on the implementation of seismic instrumentation in the fieldsites in Valais Active control algorithms of the stations based on the annotations of a model like for example to adapt the sampling rates of a sensor station based on a model based characterization of an event2008-09-01T00:00:002011-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2011 Type: task Status: open Task info: Active control algorithms of the stations based on the annotations of a model like for example to adapt the sampling rates of a sensor station based on a model based characterization of an event Deliverables: Software (Sept 10), Paper (Sept 11) Start: 1 September 2008 End: 31 August 2011 Type: task Status: open Task info: Produce an intelligently sampling SensorScope station, and demonstrate how it can impact the work of environmental research: Software/firmware, test data and 1 publication Processing strategies and tools for real-time systems related to earthquake observations2008-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2012 Type: task Status: open Task info: Software and a report (web based or publication) on processing strategies and tools for real-time systems related to earthquake observations New Mechanical Design for SensorScope (including housing, connectors, frame)2008-09-01T00:00:002009-02-28T23:59:590click here for details Start: 1 September 2008 End: 28 February 2009 Type: task Status: closed Task info: Develop a new design for the sensorscope system Instruments for short-term earthquake precursors2008-09-01T00:00:002011-02-28T23:59:590click here for details Start: 1 September 2008 End: 28 February 2011 Type: task Status: closed Task info: Report (web based or publication) on instruments for short-term earthquake precursors Data infrastructure for RECORD2008-09-01T00:00:002008-11-30T23:59:590click here for details Start: 1 September 2008 End: 30 November 2008 Type: task Status: closed Task info: Provide RECORD with the software and support it needs for acquiring, storing and retrieving data GIS based interface: Description of a Web Service Interface for sensor metadata2008-09-01T00:00:002009-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2009 Type: task Status: closed Task info: Description of a Web Service Interface for sensor metadata Development PermaSense 2nd Generation Network2008-09-01T00:00:002009-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2009 Type: task Status: closed Task info: Develop the 2nd generation PermaSense network Prototype disdrometer software2008-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2010 Type: task Status: closed Task info: Develop and support software for the prototype disdrometer LIDAR, SODAR, SensorScope field campaign2008-09-01T00:00:002009-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2009 Type: task Status: closed Task info: LIDAR, SODAR and SensorScope field campaign with the production of a paper. Prototypes of radio sensors for embedded measurements of sediment transport2008-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2010 Type: task Status: closed Task info: Produce prototypes of radio sensors for sediment transport measurement. Deliverables: hardware and a publication Climate EE pilot programme in Valais2008-09-01T00:00:002009-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2009 Type: task Status: closed Task info: Create an environmental education programme in Valais, focused around climate Operational data exploitation software2008-09-01T00:00:002010-02-28T23:59:590click here for details Start: 1 September 2008 End: 28 February 2010 Type: task Status: closed Task info: Create data exploitation software which allows efficient mining of both data and metadata GPS instrumentation in the Valais2008-09-01T00:00:002011-02-28T23:59:590click here for details Start: 1 September 2008 End: 28 February 2011 Type: task Status: open Task info: Report (web based or publication) on the implementation of GPS instrumentation in the Valais fieldsites Multihop routing, in-network processing (data compression, verification, tagging)2008-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2010 Type: task Status: open Task info: Multihop routing, in-network processing (data compression, verification, tagging) Deliverables: software and test data Start: 1 September 2008 End: 31 December 2008 Type: task Status: closed Task info: Complete a paper on SensorScope 1st generation results an experiences Education in Seismology: Final report2008-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2012 Type: task Status: open Task info: A final report (web based or publication) on the system and tools produced for education in seismology SensorScope Stations for all CCES projects2008-09-01T00:00:002009-04-30T23:59:590click here for details Start: 1 September 2008 End: 30 April 2009 Type: task Status: closed Task info: Procure and support a pool of SensorScope stations for use within the CCES projects Development of distributed temperature sensing (DTS) applications for groundwater systems2008-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2010 Type: task Status: closed Task info: Develop the DTS system for applications in groundwater systems. Deliverables: software and a publication SensorScope station for Davos schools2008-09-01T00:00:002009-05-31T23:59:590click here for details Start: 1 September 2008 End: 31 May 2009 Type: task Status: open Task info: Procure a SensorScope station for the schools in Davos Deployment and operation of high alpine field sites on Jungfraujoch and Matterhorn2008-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2012 Type: task Status: open Task info: Operate high alpine measurement sites on Jungfraujoch and Matterhorn Prototype disdrometer hardware2008-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2010 Type: task Status: closed Task info: Develop and support protype hardware for a new disdrometer Testing of SensorScope stations (part of calibration programme)2008-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2010 Type: task Status: closed Task info: Testing the SensorScope stations and producing calibrations Generalized climate EE programme2008-09-01T00:00:002010-02-28T23:59:590click here for details Start: 1 September 2008 End: 28 February 2010 Type: task Status: closed Task info: Create a generalised environmental education programme. Deliverables are a website, a notebook and a report Installation of sediment transport experimental site (Riedbach)2008-09-01T00:00:002010-02-28T23:59:590click here for details Start: 1 September 2008 End: 28 February 2010 Type: task Status: closed Task info: Installation of sediment transport experimental site (Riedbach) Long term data and metadata management2008-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2012 Type: task Status: open Task info: Ensure that data and metadata are entered into the system and that the system is used for efficient data and metadata management Multi-sensor monitoring system in the Visp area2008-09-01T00:00:002011-02-28T23:59:590click here for details Start: 1 September 2008 End: 28 February 2011 Type: task Status: open Task info: Report (web based or publication) on multi-sensor monitoring system in the Visp area Anemometer development2008-09-01T00:00:002011-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2011 Type: task Status: open Task info: Development of a field anemometer with no moving parts Deliverables: (possible design and 1 redesign phases), design considerations SensorScope 2nd Generation2008-09-01T00:00:002008-12-31T23:59:590click here for details Start: 1 September 2008 End: 31 December 2008 Type: task Status: closed Task info: Complete the design and manufacture of the 2nd generation of SensorScope stations Education in Seismology: Description of products2008-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2010 Type: task Status: closed Task info: A report (web based or publication) on the products produced for education in seismology Setup of calibration and measurement team -development of test, calibration and validation procedures (EAWAG competence: soil and groundwater sensors)2008-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2010 Type: task Status: open Task info: Set up a calibration team to develop test, calibration and validation procedures. Deliverables: Web report in months 12 and 24 Calibrate SensorScope non-meteorological sensors2008-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2010 Type: task Status: closed Task info: Produce a web publication with the calibration of SensorScope non-meteorological sensors Infrastructure for retrieving TRAMM and BigLink streaming data2008-09-01T00:00:002008-12-31T23:59:590click here for details Start: 1 September 2008 End: 31 December 2008 Type: task Status: closed Task info: Complete an infrastructure capable of retrieving and storing TRAMM and BigLink streaming data Paper on dense spatially and temporally distributed measurements from Wannengrat2008-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2010 Type: task Status: closed Task info: Produce a paper on the use of the SensorScope network to enhance and support measurements on Wannengrat Integration of PermaSense into the Swiss Experiment Data Infrastructure2008-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2010 Type: task Status: closed Task info: Integrate Permasense data and metadata into the SwissEx infrastructure Prototype disdrometer hardware2008-09-01T00:00:002009-02-28T23:59:590click here for details Start: 1 September 2008 End: 28 February 2009 Type: task Status: closed Task info: Develop a prototype of the SPAD disdrometer hardware Precipitation measurement campaign2008-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2010 Type: task Status: closed Task info: Carry out a precipitation measurement campaign and produce a paper. SwissEx EE programme2008-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2012 Type: task Status: open Task info: Create a SwissEx environmental education programme with a common website Control and publishing of non-streaming data2008-09-01T00:00:002010-02-28T23:59:590click here for details Start: 1 September 2008 End: 28 February 2010 Type: task Status: closed Task info: Produce and use and infrastructure capable of efficiently storing and retrieving non-streaming data Multi-sensor monitoring system in the Matter Valley2008-09-01T00:00:002010-02-28T23:59:590click here for details Start: 1 September 2008 End: 28 February 2010 Type: task Status: open Task info: Report (web based or publication) on a multi-sensor monitoring system in the Matter Valley Anemometer deployment, refinement and integration2008-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2010 Type: task Status: open Task info: Develop and refine a field anemometer with no moving parts Industrialisation of SensorScope 2nd generation stations2008-09-01T00:00:002009-02-28T23:59:590click here for details Start: 1 September 2008 End: 28 February 2009 Type: task Status: closed Task info: Industrialise the sensorscope station to a commercial quality. Soil and groundwater sensor installation, calibration and maintenance workshops2008-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2010 Type: task Status: open Task info: Creation of a (web) manual and organise workshops for soil and groundwater sensor installation, calibration and maintenance. Due month 12 and 24 GIS based interface: Collection of proprietary GIS-specific schemas and database domains, provided by the project partners2008-09-01T00:00:002009-02-28T23:59:590click here for details Start: 1 September 2008 End: 28 February 2009 Type: task Status: closed Task info: GIS based interface: Collection of proprietary GIS-specific schemas and database domains, provided by the project partners Control and publishing of metadata2008-09-01T00:00:002009-02-28T23:59:590click here for details Start: 1 September 2008 End: 28 February 2009 Type: task Status: closed Task info: Produce an infrastructure capable of storing metadata and publish a paper on the capabilities GIS based interface: GUI Web Interface prototype for metadata2008-09-01T00:00:002010-06-30T23:59:590click here for details Start: 1 September 2008 End: 30 June 2010 Type: task Status: closed Task info: Complete a GUI prototype for interaction with sensor data and sampled data from the projects. Calibration of SensorScope meteorological instruments2008-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2010 Type: task Status: open Task info: Produce a web publication on the wiki detailing how to calibrate the SensorScope stations, and where possible, the calibrations. Tech transfer of PermaSense technology to other Swiss Experiment projects2008-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2010 Type: task Status: closed Task info: Where possible transfer knowledge gained in PermaSense technology development to other SwissEx projects. Paper on large scale interdisciplinary deployment in Valais2008-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2012 Type: task Status: open Task info: Carry out a large scale interdisciplinary deployment in Valais and write a paper on the interdisciplinary work. A series of distributed, intelligent algorithms of Sensorscope stations (reactive and/or predictive version) to achieve efficient power management, collaborative intra-node and inter-node information processing2008-09-01T00:00:002011-02-28T23:59:590click here for details Start: 1 September 2008 End: 28 February 2011 Type: task Status: open Task info: A series of distributed, intelligent algorithms of Sensorscope stations (reactive and/or predictive version) to achieve efficient power management, collaborative intra-node and inter-node information processing Data infrastructure for COGEAR data2008-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2012 Type: task Status: open Task info: Implement the data infrastructure for the COGEAR data and metadata requirements. Deliverables: software and a report (web based or publication) Develop Sensor Communication Protocol (sensor bus)2008-09-01T00:00:002009-02-28T23:59:590click here for details Start: 1 September 2008 End: 28 February 2009 Type: task Status: closed Task info: Develop a bus communication protocol for 'daisy chaining' sensors. Control and publishing of non-streaming data2008-09-01T00:00:002010-02-28T23:59:590click here for details Start: 1 September 2008 End: 28 February 2010 Type: task Status: closed Task info: Develop a system for storage and retrieval of non-streaming data. Deliverables: Software and a paper. Development, calibaration and test of water quality sensors, total-dissolved gas pressure probes and on-site mass spectrometers2008-09-01T00:00:002010-02-28T23:59:590click here for details Start: 1 September 2008 End: 28 February 2010 Type: task Status: closed Task info: Development, calibaration and test of water quality sensors, total-dissolved gas pressure probes and on-site mass spectrometers Generic model interface2008-09-01T00:00:002010-09-01T23:59:590click here for details Start: 1 September 2008 End: 1 September 2010 Type: task Status: closed Task info: Produce a generic webservice and a plugin library for models, to allow them to retrieve data from GSN. Meteoswiss and BAFU data (depending on access possibilities)2008-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2012 Type: task Status: open Task info: Make data from Meteoswiss and BAFU accessible over the SwissEx infrastructure where possible. Integration of all data into the infrastructure2008-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2012 Type: task Status: open Task info: Integrate as much data as possible into the SwissEx infrastructure and get people using it. It is only worthwhile if it is used. WP2 Milestone1: Comparison of SensorMap vs. IKA GIS interface2008-09-01T00:00:002011-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2011 Type: milestone Status: open Task info: Comparison of SensorMap vs. IKA GIS interface WP3 Milestone 5: Hydromon self organising wireless network2008-09-01T00:00:002010-02-28T23:59:590click here for details Start: 1 September 2008 End: 28 February 2010 Type: milestone Status: closed Task info: WP3 Milestone 1: Hydromon self organising wireless network WP3 Milestone 1: Sensorscope 2nd generation network2008-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2010 Type: milestone Status: closed Task info: WP3 Milestone 1: Sensorscope 2nd generation network WP3 Milestone 6: Sensorscope 3rd generation network2008-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2012 Type: milestone Status: open Task info: Sensorscope 3rd generation network WP1 Milestone1: Integration of data2008-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2012 Type: milestone Status: open Task info: Integration of data WP3 Milestone 2: Setup of Calibration and Measurement Team2008-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2010 Type: milestone Status: open Task info: WP3 Milestone 1: Setup of Calibration and Measurement Team WP3 Milestone 7: Sensorscope extreme environment testing2008-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2010 Type: milestone Status: closed Task info: Sensorscope extreme environment testing WP1 Milestone2: Baseline SwissEx data infrastructure completion2008-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2012 Type: milestone Status: open Task info: Baseline SwissEx data infrastructure completion WP3 Milestone 8: Completion of RADAR, LIDAR and Disdrometer development2008-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2012 Type: milestone Status: open Task info: Completion of RADAR, LIDAR and Disdrometer development WP1 Milestone3: Advanced infrastructure development completion2008-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2012 Type: milestone Status: open Task info: Advanced infrastructure development completion WP3 Milestone 4: Permasense 2nd generation network2008-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2012 Type: milestone Status: open Task info: WP3 Milestone 1: Permasense 2nd generation network WP4 Milestone 1: Integration of CCES projects into the SwissEx infrastructure2008-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2008 End: 31 August 2012 Type: milestone Status: open Task info: Integration of CCES projects into the SwissEx infrastructure Energy Efficient Collaborative Routing Algorithms2008-11-01T00:00:002010-08-31T23:59:590click here for details Start: 1 November 2008 End: 31 August 2010 Type: task Status: closed Task info: Optimise the routing algorithms to allow the use of lower power systems New Sensors in SensorScope (Disdrometer, Snow Depth)2009-02-01T00:00:002010-08-31T23:59:590click here for details Start: 1 February 2009 End: 31 August 2010 Type: task Status: closed Task info: Integrate new sensors into the SensorScope system Infrastructure workshop2009-02-01T00:00:002009-02-28T23:59:590click here for details Start: 1 February 2009 End: 28 February 2009 Type: task Status: closed Task info: Organise an infrastructure workshop SwissEx Meeting2009-02-01T00:00:002009-02-28T23:59:590click here for details Start: 1 February 2009 End: 28 February 2009 Type: task Status: closed Task info: SwissEx General Meeting Long-Range Communication Module2009-02-01T00:00:002010-02-28T23:59:590click here for details Start: 1 February 2009 End: 28 February 2010 Type: task Status: closed Task info: Make SensorScope stations capable of inter-node communication over 'long' distances (km) Routing Algorithms for Long Range Communication2009-02-01T00:00:002010-02-28T23:59:590click here for details Start: 1 February 2009 End: 28 February 2010 Type: task Status: closed Task info: Develop routing algorithms to optimise long range communications Mobile radar field campaign2009-02-01T00:00:002012-08-31T23:59:590click here for details Start: 1 February 2009 End: 31 August 2012 Type: task Status: closed Task info: Conduct a mobile radar field campaign Develop Camera System for SensorScope2009-02-01T00:00:002010-08-31T23:59:590click here for details Start: 1 February 2009 End: 31 August 2010 Type: task Status: closed Task info: Integrate a good quality webcam into the SensorScope system. GIS based interface: Unification of the schemas and database domains, Planning a distributed GIS metadata model using Web Services2009-02-01T00:00:002009-08-31T23:59:590click here for details Start: 1 February 2009 End: 31 August 2009 Type: task Status: closed Task info: Unification of the schemas and database domains, Planning a distributed GIS metadata model using Web Services WP3 Milestone 3: Long distance communications links2009-02-01T00:00:002010-02-01T23:59:590click here for details Start: 1 February 2009 End: 1 February 2010 Type: milestone Status: closed Task info: WP3 Milestone 1: Long distance communications links Hydromon data analysis package2009-03-01T00:00:002010-02-28T23:59:590click here for details Start: 1 March 2009 End: 28 February 2010 Type: task Status: closed Task info: Develop a data analysis package for the Hydromon sensor network Paper on SensorScope 2nd Generation Network2009-04-01T00:00:002010-08-31T23:59:590click here for details Start: 1 April 2009 End: 31 August 2010 Type: task Status: closed Task info: Write a paper on the 2nd Generation SensorScope hardware and experience in its deployments SensorScope Testbed in Wannengrat2009-04-01T00:00:002010-04-30T23:59:590click here for details Start: 1 April 2009 End: 30 April 2010 Type: task Status: closed Task info: Deploy and support a SensorScope deployment on Wannengrat SensorScope 3rd Generation2009-05-01T00:00:002011-08-31T23:59:590click here for details Start: 1 May 2009 End: 31 August 2011 Type: task Status: open Task info: Develop the 3rd generation of the SensorScope system SwissEx Meeting2009-07-01T00:00:002009-08-31T23:59:590click here for details Start: 1 July 2009 End: 31 August 2009 Type: task Status: closed Task info: SwissEx General Meeting Data infrastructure for Mountland, Majolica and APUNCH streaming data2009-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2009 End: 31 August 2010 Type: task Status: closed Task info: Produce a data infrastructure capable of retrieving Mountland, Majolica and APUNCH streaming data Sensorscope station deployment and soil sensor calibration for APUNCH2009-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2009 End: 31 August 2012 Type: task Status: closed Task info: Provide APUNCH with deployment support in SensorScope station deployment and sensor calibration GIS based interface: Implementation of a Web Service Interface for available sensor metadata of the project partners2009-09-01T00:00:002010-02-28T23:59:590click here for details Start: 1 September 2009 End: 28 February 2010 Type: task Status: closed Task info: Data from COGEAR successfully imported. Data from GSN is a separate task. Sediment transport experiments2009-09-01T00:00:002010-08-31T23:59:590click here for details Start: 1 September 2009 End: 31 August 2010 Type: task Status: closed Task info: Sediment transport experiments. Deliverables: methodology publication Remote Network Management and Reconfiguration2009-09-01T00:00:002011-08-31T23:59:590click here for details Start: 1 September 2009 End: 31 August 2011 Type: task Status: open Task info: Develop a system for remote network management and reconfiguration Automated, event-driven sampling schemes for water-quality issues2009-09-01T00:00:002011-08-31T23:59:590click here for details Start: 1 September 2009 End: 31 August 2011 Type: task Status: open Task info: Develop event driven sampling schemes for water quality monitoring:Software/firmware, test data, 1 publication Automatic In-Network QA/QC2009-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2009 End: 31 August 2012 Type: task Status: open Task info: Develop an algorithm and infrastructure to allow automated, in-network data quality assessment. GIS based interface: Maintenance2009-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2009 End: 31 August 2012 Type: task Status: open Task info: Maintenance of the GIS based interface Disdrometer prototype deployment2009-10-01T00:00:002010-06-30T23:59:590click here for details Start: 1 October 2009 End: 30 June 2010 Type: task Status: closed Task info: Deploy a prototype of the new disdrometer Network Monitoring Tool2009-12-01T00:00:002010-11-30T23:59:590click here for details Start: 1 December 2009 End: 30 November 2010 Type: task Status: open Task info: Create a network monitoring tool to work with the remote network monitoring task SwissEx Meeting2010-01-01T00:00:002010-02-28T23:59:590click here for details Start: 1 January 2010 End: 28 February 2010 Type: task Status: closed Task info: SwissEx General Meeting WP4 Milestone 2: Precipitation measurement campaign in alpine terrain2010-01-01T00:00:002011-02-28T23:59:590click here for details Start: 1 January 2010 End: 28 February 2011 Type: milestone Status: open Task info: Precipitation measurement campaign in alpine terrain Procedure for inference of statistical and scaling properties of precipitation data2010-02-01T00:00:002011-02-28T23:59:590click here for details Start: 1 February 2010 End: 28 February 2011 Type: task Status: open Task info: Procedure for inference of statistical and scaling properties of precipitation data. Deliverables: Methodology publication and software. Infrastructure workshop2010-02-01T00:00:002010-02-28T23:59:590click here for details Start: 1 February 2010 End: 28 February 2010 Type: task Status: closed Task info: Organise an infrastructure workshop Calibration of X-Band radar2010-02-01T00:00:002011-02-28T23:59:590click here for details Start: 1 February 2010 End: 28 February 2011 Type: task Status: open Task info: Calibration of X-Band radar. Deliverables: methodology and publication GIS based interface: Alignment of the Web Service Interface with the general SwissEx Metadata Model, Adaptations of the Web Service Interface2010-02-01T00:00:002010-04-30T23:59:590click here for details Start: 1 February 2010 End: 30 April 2010 Type: task Status: closed Task info: Adapt the web service interface to pull sensor metadata from databases of project partners Rainfall data disaggregation techniques2010-02-01T00:00:002010-02-28T23:59:590click here for details Start: 1 February 2010 End: 28 February 2010 Type: task Status: open Task info: Rainfall data disaggregation techniques methodology publication and software Fusion of streaming data with sampled data2010-02-28T00:00:002011-08-31T23:59:590click here for details Start: 28 February 2010 End: 31 August 2011 Type: task Status: open Task info: Join the streaming data with the manually sampled data and provide systems for mining and jointly displaying both. Deliverables: Publication Installation of GPS station for water vapour tomography2010-02-28T00:00:002010-08-31T23:59:590click here for details Start: 28 February 2010 End: 31 August 2010 Type: task Status: open Task info: Installation of GPS station for water vapour tomography GIS based interface: Implementation of the Web Service Interface for first incoming sensor data of the project partners2010-04-01T00:00:002010-08-31T23:59:590click here for details Start: 1 April 2010 End: 31 August 2010 Type: task Status: closed Task info: Implement the web service interface for the sensor data of partners. CCES Status report 2010 compilation2010-07-01T00:00:002010-07-23T23:59:590click here for details Start: 1 July 2010 End: 23 July 2010 Type: task Status: closed Task info: Compilation of SwissEx section of 2010 CCES status report Provision of Year 2 progress text to Nick2010-07-01T00:00:002010-08-31T23:59:590click here for details Start: 1 July 2010 End: 31 August 2010 Type: task Status: closed Task info: Just text not finances for period September 2009 to September 2010 GIS based interface: Implementation of cartographic tools for visual data mining2010-07-01T00:00:002011-05-31T23:59:590click here for details Start: 1 July 2010 End: 31 May 2011 Type: task Status: open Task info: Implementation of data mining tools. GIS based interface: Interface description for accessing available sensor data of the project partners using Web Services2010-07-01T00:00:002010-08-31T23:59:590click here for details Start: 1 July 2010 End: 31 August 2010 Type: task Status: closed Task info: Document the GIS based interface for visualisation and access to data from partners. GIS based interface: Web Service Interface implementation progress report for available sensor data of the project partners2010-08-01T00:00:002010-08-31T23:59:590click here for details Start: 1 August 2010 End: 31 August 2010 Type: task Status: closed Task info: Produce a progress report on the implementation of the sensor data web service interface Provision of Year 2 finances to Nick2010-09-01T00:00:002010-10-31T23:59:590click here for details Start: 1 September 2010 End: 31 October 2010 Type: task Status: closed Task info: Provision of finances for the period 1st September 2009 to 31st August 2010 to Nick Rainfall field estimation from combination of radar and raingauge observations2010-09-01T00:00:002011-08-31T23:59:590click here for details Start: 1 September 2010 End: 31 August 2011 Type: task Status: open Task info: Rainfall field estimation from combination of radar and raingauge observations. Deliverables: methodology and publication GIS based interface: Final version of the GUI Web Interface, Bug fixing2010-09-01T00:00:002011-08-31T23:59:590click here for details Start: 1 September 2010 End: 31 August 2011 Type: task Status: open Task info: Creation of the final version of the GUI web interface Paper on characterisation of annotations on a data model2010-09-01T00:00:002011-08-31T23:59:590click here for details Start: 1 September 2010 End: 31 August 2011 Type: task Status: open Task info: Produce a paper on the characterisation of annotations on a data model Submission of year 2 report2010-11-01T00:00:002010-11-05T23:59:590click here for details Start: 1 November 2010 End: 5 November 2010 Type: task Status: closed Task info: Compilation and submission of year 2 report Latsis Symposium2010-11-15T00:00:002010-11-17T23:59:590click here for details Start: 15 November 2010 End: 17 November 2010 Type: task Status: closed Task info: Compulsory conference for all groups within SwissEx, held at the ETH main building. All CCES projects will be participating. CCES 2010 Assessment2010-11-17T00:00:002010-11-19T23:59:590click here for details Start: 17 November 2010 End: 19 November 2010 Type: task Status: closed Task info: Assessment of the project by the ETH board as in 2008. Paper on SensorScope 3rd Generation Network2011-01-01T00:00:002011-08-31T23:59:590click here for details Start: 1 January 2011 End: 31 August 2011 Type: task Status: open Task info: Write a paper on the 3rd generation SensorScope system SwissEx Meeting2011-01-01T00:00:002011-02-28T23:59:590click here for details Start: 1 January 2011 End: 28 February 2011 Type: task Status: closed Task info: SwissEx General Meeting Infrastructure workshop2011-02-01T00:00:002011-02-28T23:59:590click here for details Start: 1 February 2011 End: 28 February 2011 Type: task Status: open Task info: Organise an infrastructure workshop Provision of Year 3 progress text to Nick2011-07-01T00:00:002011-08-31T23:59:590click here for details Start: 1 July 2011 End: 31 August 2011 Type: task Status: open Task info: Just text not finances for period September 2010 to September 2011 SwissEx Meeting2011-07-01T00:00:002011-08-31T23:59:590click here for details Start: 1 July 2011 End: 31 August 2011 Type: task Status: closed Task info: SwissEx General Meeting Organization of a summer research institute in conjunction with a technical workshop on long-term remote sensing2011-08-01T00:00:002011-08-31T23:59:590click here for details Start: 1 August 2011 End: 31 August 2011 Type: task Status: open Task info: Organization of a summer research institute in conjunction with a technical workshop on long-term remote sensing Provision of Year 3 finances to Nick2011-09-01T00:00:002011-10-31T23:59:590click here for details Start: 1 September 2011 End: 31 October 2011 Type: task Status: open Task info: Provision of finances for the period 1st September 2010 to 31st August 2011 to Nick WP4 Milestone 3: Vispa catchment measurement campaign2011-09-01T00:00:002012-08-31T23:59:590click here for details Start: 1 September 2011 End: 31 August 2012 Type: milestone Status: open Task info: Vispa catchment measurement campaign Submission of year 3 report2011-11-01T00:00:002011-11-05T23:59:590click here for details Start: 1 November 2011 End: 5 November 2011 Type: task Status: open Task info: Compilation and submission of year 3 report SwissEx Meeting2012-01-01T00:00:002012-02-28T23:59:590click here for details Start: 1 January 2012 End: 28 February 2012 Type: task Status: open Task info: SwissEx General Meeting
Active items listThe table below shows all open items starting before today. Overdue tasks are highlighted in red.
Pending tasksThe table below shows all tasks due to start after today.
Completed tasksThe table below shows all completed tasks (task closed, regardless of start or end date or completion percent.)
This online tool aims to reflect and enhance the information contained in the SwissEx Workplan | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
