July 30, 2010, Friday, 210

Fieldsite:Ac31382

From SwissExperiment

Ac31382
Jump to: navigation, search

ADAPT Zambezi Basin Deployment/Fieldsite

Deployment/Fieldsite Information
Deployment ADAPT Zambezi Basin Location

Photos
Videos
Wikipedia
Webcams

Keywords dam, water resource
Coordinates 15.620391706641964° S, 30.419082641601562° ELatitude: 15°37′13.41″S
Longitude: 30°25′8.698″E
Altitude 1000 m
Swiss Eastings
Swiss Northings
Swiss Altitude m
Start Date
End Date
Institutes using fieldsite EAWAG
Edit this information Click here
Tasks Register a new measurement location
Register a sensor deployment
Register a sensor instance
Register a sensor model
Register an observation
Bulk Load information
You are here. For help, click here
Image
Fieldsite Observations
Click here to register observations about the fieldsite. Enter the location name for both the database table name and parameter name.
You have not registered any observations
Measurement Locations
Click here to add a new measurement location




There are 0 biodiversity records associated with this location

http://www.cces.ethz.ch/projects/nature/adapt

Adapt planning and operation of large dams to social needs and environmental constraints - an integrated water resource management study in the Zambezi Basin

The goal of the interdisciplinary ADAPT project is to enhance the scientific basis of integrated water resource management (IWRM) by developing new models that can be used to improve the operation of existing large hydraulic structures and in designing future schemes. These models will incorporate new concepts of multi-objective optimization and real-time control. The approach will be calibrated with novel data resources and used to investigate the large reservoirs and wetlands in the Zambezi River Basin, but will be readily adaptable to other complex river basin systems.